SELPNCTRLREMOVEREACH - Automatically Select P/N Control on a R/O if Scheduled Removals are ReachedAutomatically Select P/N Control on a R/O if Scheduled Removals are Reached Affected Window: w_ro_order_detail_eu
Switch Set to Yes: When set to Yes, P/N Controls for Part Number Serial Numbers are automatically selected on a Repair Order if the P/N Control's amount of Scheduled Removals are reached. Notice that the following P/N Control has a Removal Schedule of '2.' From the P/N Inventory Control window of the Inventory Transaction, notice that this P/N S/N (with the above P/N Control) has been removed '1' time, as indicated by the Actual Removal field. The P/N S/N is then remove for a second time from an aircraft. Notice now that the Actual Removals has reached the Scheduled Removals limit. This P/N S/N is then placed on a Repair Order. From the Repair Order Detail, Control tab, notice that the above P/N Control has been automatically selected because of its Removal limits.
Switch Set to No: When set to No, P/N Controls for Part Number Serial Numbers are not selected on a R/O if the P/N Control's amount of Scheduled Removals are reached. The same P/N S/N from the above example was removed from the R/O. Then that P/N S/N was re-inserted into the R/O. From the Repair Order Detail, Control tab, notice that the P/N Control has not been automatically selected, regardless of its Removal limits. |
||||||
Top of Page |
Publication Date: 11/12/2024
![]() ![]() ![]() ![]() |
|||||