Publication Date: 11/12/2024
![]() ![]() ![]() ![]() |
||||||
ORECMSG - Orders E/C NotificationOrders E/C Notification Affected windows: w_sr_order_detail_eu, w_ex_order_detail_eu, w_lo_order_detail_eu, w_po_order_detail_eu, w_ro_order_detail_eu
Switch Set to Yes: When set to Yes, upon creating an Order, the user will be notified when a Part Number (P/N) is linked to an Engineering Control (E/C). The following P/N is linked to an E/C. Notice that the informational warning message appears upon saving an Order with the P/N linked to the E/C.
Switch Set to No: When set to No, upon creating an Order, the user will not be notified when a P/N is linked to an Engineering Control E/C. The following E/C is linked to a P/N. In the Order window, the user may save without the informational warning. |
||||||
Top of Page |
Publication Date: 11/12/2024
![]() ![]() ![]() ![]() |
|||||