Publication Date: 11/12/2024
![]() ![]() ![]() ![]() |
||||||
P/N Initial Load ProcessThe P/N Initial Load option is used to enter a part that has no prior history within the system. For example, when a part is removed from an older aircraft that was set up in the system, but the individual parts from the aircraft were not set up. This option will also allow you to load parts to inventory from manual records. The part number must be created in the system first (Settings/Update/Part Number Master). Additional information may be required (according to P/N settings), such as time control or lower assembly information. The P/N Initial Load process is designed to allow users to visualize the entire procedure for loading a Part Number into the system. Each step in the process chart is explained in further detail throughout the following documentation. The procedural sections are broken down into the following categories:
|
||||||
Top of Page |
Publication Date: 11/12/2024
![]() ![]() ![]() ![]() |
|||||