Concession Registry ProcessA Concession will increase the schedule limitation for a specific item, as per company and Aviation Authority requirements (i.e. a concession is a granted extension of utilization). This option will allow the user to enter concessions for Engineering Controls, P/N Controls, and Defects. Where a Concession is applied to a repetitive inspection, once the inspection has been carried out, the Concession limitation will be removed (subtracted) from the next occurrence of the inspection. The following process flow is a general guide for the configuration, creation, and utilization of the Concession Registry life cycle. This life cycle may vary depending on each user and their company's customized protocols. The following sections are the primary elements covered in this process flow:
|
||||||