Publication Date: 11/12/2024 Share Print

Previous Topic

Next Topic

Book Contents

Book Index

APU Process

The P/N APU Process includes the setup of a P/N APU, or Auxiliary Power Unit.The P/N APU configuration takes place during the Part Number Creation Process. All APU assembly components, including the APU NHA and all APU NLAs, should be configured similarly via the P/N Master. From this, the Time and Cycles can be updated through the P/N APU Reading or the Hours and Cycles Factors of the Technical Engineering tab of the P/N, depending on the configuration of Switch APUREAD. The P/N APU Reading option is available to record time specifically on the APU. The Hours and Cycles Factors are utilized against the A/C the P/N APU is Installed on.

The following process flow is a general guide for the configuration, creation, and reading of the APU Process. This life cycle may vary depending on each user and their customized protocols.

eMRO APU Process

The following sections are the primary elements covered in this process flow:

  • APU Setup and Configuration
  • P/N APU Creation and Reading

See Also

PROCESS FLOWS

Aircraft Actual Flight (Manual Entry) Process

Aircraft Initial P/N Load Process

Aircraft Return and Archiving Process

Aircraft Units Process

Assembly Management

Authorization Process

Concession Registry Process

Consigned Inventory Process

Contract Order Process

Customer Creation Process

Defect Report Process

Delete E/C and P/N Control Compliance Process

Dent Mapping Process

Employee and Skill Creation Process

Engineering Control Process

Engineering Pending Release Process

Engineering Request Review Process

ETOPS Process

Exchange Order Out Process

Exchange Order Process

Fault Code Report Process

Follow Up Requirements (FUR) Process

Importing a File Process

Internal Component Repair (Shop) Process

Kit Management

Loan Order Process

Location Creation Process

Man Hours Schedule Planning Process

Managed A/C and Inventory Process

MEL Process

Missing Parts Process

Monthly Financial Procedures

New Aircraft Process

Order Invoice Process

P/N Control - Life Limited Parts (LLP)

P/N Initial Load Process

P/N Pool Agreement Process

P/N Remove/Install Process

Packing and Shipping Process

Picklist and Requisition Process

Purchase Order Process

Quality Assurance Process

R/O Capability Employee Rating Process

Receiving Process

Recurrent Item Alert (Reliability) Process

Rental Order Process

Re-Order Level Process

Repair Order Process

Repair Order Following Process

Return to Stock Process

Return To Vendor Process

Rotor Wing Aircraft Integration

Sales Order Process

Scrap Process

Service Order and Power By The Hour Process

Skill Master Process

Supply Chain Process

System Notification Creation Process

Task Card Creation Process

Third Party Work Order Process

Tool Management

Training Process

Transfer Order Process

TraxDoc Process

Vendor Creation Process

W/O Task Card Bust Process

Warranty Management

Work Order Process

Work Order Reservation Control Process

Work Turnover Process

Top of Page Publication Date: 11/12/2024 Share Print