Publication Date: 11/12/2024
![]() ![]() ![]() ![]() |
||||||
MANLLOR - Disable Lower Level and Override checkboxes if E/C is MandatoryDisable Lower Level and Override checkboxes if E/C is Mandatory Affected Window: w_engineering_eu Switch Set to Yes: When set to Yes, the Lower Level and Ovr checkboxes of the E/C, Schedule Control tab cannot be selected for Mandatory E/Cs. A hard warning appears when saving the E/C if either of these checkboxes are selected. The following Engineering Control has been created with a Classification of Mandatory. Notice in the Engineering Control, Schedule Control tab, the Lower Level and Override checkboxes are disabled and cannot be selected.
Switch Set to No: When set to No, the Lower Level and Ovr checkboxes of the E/C, Schedule Control tab can be selected and saved for Mandatory E/Cs. The following Engineering Control has been created with a Classification of Mandatory. Notice in the Engineering Control, Schedule Control tab, either the Lower Level or Override checkbox can be selected for each record added. |
||||||
Top of Page |
Publication Date: 11/12/2024
![]() ![]() ![]() ![]() |
|||||