Publication Date: 11/12/2024 Share Print

Previous Topic

Next Topic

Book Contents

Book Index

Engineering Control

The Engineering Control (E/C) option allows users to configure the controls and requirements associated with aircraft and parts within the system. Additional controls are used along with the basic E/C configuration, which are described later.

E/Cs are effective either to aircraft or components (parts). Airworthiness Directive (AD) and Service Bulletin (SB) status can be tracked for aircraft by using E/Cs. Component related P/N E/Cs can be tracked as well, with the additional capability to specify hard time limitations. These items can then appear in Planning Control for scheduling.

Task Card requirements can be linked to the E/C. The Task Cards are then added to the Work Orders (along with the E/C) in the Production module or via the Planning Control application.

When the Task Cards are completed under the Work Order, this then allows the E/C status to be updated (when the Work Order is closed). Compliance records are also written.

The critical items for the control of the E/C are the schedule and the effectivity. There are numerous combinations of ways to configure E/Cs and relative information. Please consider additional support regarding this matter if necessary.

The E/Cs may require authorization. One step authorization or complex authorization processes may be set up. Please refer to the E/C Authorization section for additional information.

The following tabs and buttons are available:

Engineering Control Tabs

Engineering Control Buttons

General Tab

Schedule Tab

Schedule Control Tab

Other Tab

E/C Content Tab

Optional Tab

P/N Effectivity Control Tab

Warranty Tab

Affected Manuals Tab

Schedule Controlled By Tab

Authorization History Tab

Location/Site Ban Control Tab

Restrictions Tab

Informational Tab

Revision History Tab

Vendor Restrictions Tab

 

New button

Save button

Delete button

eMRO_but_Note_Main Notes button

Print button

Reset button

Audit button Audit button logo_V7_small

Compliance button

Sub Functions

Document button

A/C button

P/N CTL button

Task Card Control button

Task Card button

Revision Control button

but_View Forms Forms button

Attachment button

E/C Rename/Copy button

Change E/C Revision button

but_cost_small Economic Analysis button

MPD button

planning button Planning button logo_V7_small

engineering request button ENG Request button logo_V7_small

Records can be created/opened from the Engineering Control Selection.

In This Section

Engineering Control, General Tab

Engineering Control, Schedule Tab

Engineering Control, Schedule Control Tab

Engineering Control, Other Tab

Engineering Control, E/C Content Tab

Engineering Control, Optional Tab

Engineering Control, Software Tab

Engineering Control, P/N Effectivity Control Tab

Engineering Control, Warranty Tab

Engineering Control, Affected Manuals Tab

Engineering Control, Schedule Controlled By Tab

Engineering Control, Authorization History Tab

Engineering Control, Location/Site Ban Control Tab

Engineering Control, Restrictions Tab

Engineering Control, Informational Tab

Engineering Control, Revision History Tab

Engineering Control, Vendor Restrictions Tab

Engineering Control Buttons

See Also

Engineering Control Selection

Engineering Control Selection, General Tab

Engineering Control Selection, Other Tab

Import Button, via Engineering Control Selection

Notes Button, via Engineering Control Selection

eMRO Smart Query Button, via Engineering Control Selection

MPD Import Button, via Engineering Control Selection

Top of Page Publication Date: 11/12/2024 Share Print