Publication Date: 11/12/2024 Share Print

Previous Topic

Next Topic

Book Contents

Book Index

Planning button, via Engineering Control

logo_V7_Big

Selecting the Planning button Prompts the Planning Query window. This window details the Control, Actual, and Initial Schedules and Planning Information of the associated record. Planning Information displayed in this window is also reflected in Planning Control. For more information, refer to the Planning Control module.

EC Planning Query

The following information/options are available in this window:
_____________________________________________________________________________________

A/C

The individual aircraft tail number.

E/C

The Engineering Control that specifies aircraft or component scheduled maintenance intervals.

P/N

The Part Number reference for the aircraft part.

P/N S/N

The Serial Number of the Part Number associated with the record.

Position

The related A/C position.

Due Date

The date that the maintenance item was due.

REV Due Date

The date that the revision is due.

W/O

The Work Order used to categorize, manage, and schedule work requirements for aircraft maintenance.

Internal Checkbox

The Internal checkbox is used to determine if work can be done internally. The Internal Capability checkbox will be set to 'On' by default only for those items that a company has the capability to perform internally. The checkbox can be set up through Defect Reports/General Tab, E/C/Other Tab, and P/N Master/P/N Control button.

Description

A free-text description of the item.

Control Schedule Hours/Cycles/Day

The entered Hours/Cycles/Day Schedule of the associated Control E/C.

Control Schedule Date

The entered Scheduled Date of the associated Control E/C.

Initial Schedule Hours/Cycles/Day

The initial Hours/Cycles/Day schedule entered against the E/C record.

A/C Schedule Hours/Cycles/Day

The actual Hours/Cycles/Day scheduled against the E/C record.

Remaining Time

The amount of time remaining on the E/C's entered schedule(s).

Remaining Cycles

The number of cycles remaining on the E/C's entered schedule(s).

Remaining Day

The number of remaining days on the E/C's entered schedule(s).

_____________________________________________________________________________________

The Export as Excel button can be selected to view the queried data (including all pages) in an Excel spreadsheet. This Excel file can be saved for later use. For more information refer to the Export as Excel Button via the eMRO System Standards manual.

The Filter/Sort filter sort button button is used to alter the search criteria for records associated with the host module and window. For more information, refer to Filter/Sort Button via the eMRO System Standards Module.

See Also

Engineering Control Buttons

Notes Button, via Engineering Control

Print Button, via Engineering Control

Audit Button, via Engineering Control

Compliance Button, via Engineering Control

Document Button, via Engineering Control

A/C Button, via Engineering Control

P/N CTL Button, via Engineering Control

Task Card Control Button, via Engineering Control

Task Card Button, via Engineering Control

Revision Control, via Engineering Control

Attachment Button, via Engineering Control

Forms Button, via Engineering Control

E/C Rename/Copy Button, via Engineering Control

Change E/C Revision Button, via Engineering Control

Economic Analysis Button, via Engineering Control

MPD Button, via Engineering Control

ENG Request Button, via Engineering Control

Top of Page Publication Date: 11/12/2024 Share Print