Publication Date: 11/12/2024 Share Print

Previous Topic

Next Topic

Book Contents

Book Index

Task Card Button, via Engineering Control

From the Engineering Control window, select the Task Card button. The user will be redirected to a Task Card Selection window.

Select the New button to create new Task Cards as required. Populate all mandatory information and select the Save button.

Note: Task Cards are not linked to Engineering Controls from this button. To link a T/C to an E/C, select the Task Card Control Button via the Engineering Control window.

For additional information, refer to the Task Card topics in the Engineering - T/C Training Manual.

See Also

Engineering Control Buttons

Notes Button, via Engineering Control

Print Button, via Engineering Control

Audit Button, via Engineering Control

Compliance Button, via Engineering Control

Document Button, via Engineering Control

A/C Button, via Engineering Control

P/N CTL Button, via Engineering Control

Task Card Control Button, via Engineering Control

Revision Control, via Engineering Control

Attachment Button, via Engineering Control

Forms Button, via Engineering Control

E/C Rename/Copy Button, via Engineering Control

Change E/C Revision Button, via Engineering Control

Economic Analysis Button, via Engineering Control

MPD Button, via Engineering Control

Planning button, via Engineering Control

ENG Request Button, via Engineering Control

Top of Page Publication Date: 11/12/2024 Share Print