Task Card Control Button, via Engineering Control

The Task Card Control function allows the user to link Task Cards to an E/C.

Just as E/Cs have their own setup configuration and requirements, Task Cards have their own configuration and requirements as well.

When an E/C is added to the Work Order, the Task Cards attached to that E/C will be automatically brought into the Work Order also at the same time, based on the configuration of the Task Card. For example, if A/C Effectivity is switched 'On' for the Task Cards, only Task Cards with the same Effectivity as the aircraft listed on the Work Order will be copied.

Switch ECTCLINK controls how E/Cs and Task Cards are linked in the system. If this switch is set to No, the E/C-T/C link will work either way. The user can modify E/C-T/C links via revisions to E/Cs or T/Cs from either the Engineering Control window or Task Card control window. If this switch is set to Yes, modifications to E/C-T/C links will be modified by default from the Task Card control window. If this switch is set to Yes and the Config Other field contains EC, then engineering links will only be modified from the E/C-T/C control window.

The following tabs and buttons are available:

Engineering Task Card Control Tabs

Engineering Task Card Control Buttons

General Tab

Informational Tab

Reset button

New button

Save button

Delete button

eMRO_but_Note_Main Notes button

Select button

but_task_card_control_small Multi Task Card Select button

Audit button

In This Section

Engineering Task Card Control, General Tab

Engineering Task Card Control, Informational Tab

Engineering Task Card Control Buttons

See Also

Engineering Control Buttons

Notes Button, via Engineering Control

Print Button, via Engineering Control

Audit Button, via Engineering Control

Compliance Button, via Engineering Control

Document Button, via Engineering Control

A/C Button, via Engineering Control

P/N CTL Button, via Engineering Control

Task Card Button, via Engineering Control

Revision Control, via Engineering Control

Attachment Button, via Engineering Control

Forms Button, via Engineering Control

E/C Rename/Copy Button, via Engineering Control

Change E/C Revision Button, via Engineering Control

Economic Analysis Button, via Engineering Control

MPD Button, via Engineering Control

Planning button, via Engineering Control

ENG Request Button, via Engineering Control

Top of Page Publication Date: 11/12/2024 Share Print