MANUALS > Engineering > Engineering Module - E/C > Engineering E/C, Update Menu > Engineering Control Selection > Engineering Control > Engineering Control Buttons > P/N CTL Button, via Engineering Control
P/N CTL Button, via Engineering Control
The P/N CTL button allows users to set P/N effectivity for the E/C. Effectivity can be applied to specific components (parts) in addition to being overridden down to a specific serial number. Effectivity can be added or removed through the New and Delete buttons as needed.
Note: For a P/N E/C to be called onto a work package via a P/N Control, the P/N S/N must have effectivity set up at the P/N E/C level. For more information, refer to the P/N Control button, via P/N Master.
The Override button is used to apply specific S/N effectivity if required.
For information regarding authorization steps for P/N E/Cs, refer to Adding Authorization Steps for the P/N E/C, via Engineering Control.
The following tabs and buttons are available:
In This Section Adding Authorization Steps for the P/N E/C, via Engineering Control Engineering Control P/N, General Tab Engineering Control P/N, Informational Tab Engineering Control P/N Buttons |
See Also Engineering Control Buttons Notes Button, via Engineering Control Print Button, via Engineering Control Audit Button, via Engineering Control Compliance Button, via Engineering Control Document Button, via Engineering Control A/C Button, via Engineering Control Task Card Control Button, via Engineering Control Task Card Button, via Engineering Control Revision Control, via Engineering Control Attachment Button, via Engineering Control Forms Button, via Engineering Control E/C Rename/Copy Button, via Engineering Control Change E/C Revision Button, via Engineering Control Economic Analysis Button, via Engineering Control MPD Button, via Engineering Control Planning button, via Engineering Control ENG Request Button, via Engineering Control |
|