MANUALS > Engineering > Engineering Module - E/C > Engineering E/C, Update Menu > Engineering Control Selection > Engineering Control > Engineering Control, Restrictions Tab
Engineering Control, Restrictions Tab
The Restrictions Tab allows the user to specify the Restriction Codes for the Work Orders that contain the currently selected E/C.

The following information/options are available in this window: _____________________________________________________________________________________
Restriction Code
Reason for restriction (code). The available codes are set up in Location Restrictions Transaction Code in Settings/system Transaction Code Explorer/Settings/Location Restrictions.
_____________________________________________________________________________________
Note: The Restriction codes are configured in the Location Master via the Settings module. These codes are created in the System Transaction code option. For more information on how Restriction codes relate to the Location Master, refer to the Site Inactive Schedule button via Location Master in the Settings manual.
Select the New button to add multiple restriction codes.
Select the Delete button to delete one or more restriction code(s).
The Notes and Attachment buttons are available to include relevant information.
In This Section Notes Button, via Engineering Control, Restrictions Tab Attachment Button, via Engineering Control, Restrictions Tab |
See Also Engineering Control Engineering Control, General Tab Engineering Control, Schedule Tab Engineering Control, Schedule Control Tab Engineering Control, Other Tab Engineering Control, E/C Content Tab Engineering Control, Optional Tab Engineering Control, Software Tab Engineering Control, P/N Effectivity Control Tab Engineering Control, Warranty Tab Engineering Control, Affected Manuals Tab Engineering Control, Schedule Controlled By Tab Engineering Control, Authorization History Tab Engineering Control, Location/Site Ban Control Tab Engineering Control, Informational Tab Engineering Control, Revision History Tab Engineering Control, Vendor Restrictions Tab Engineering Control Buttons |
|