The Due List tab lists all maintenance events that are coming due (as opposed to tasks that are already due/overdue in the Dashboard's Due List). Users can specify which aircraft, specific due date, and the maintenance events they want to see (Defects, E/Cs, P/N E/Cs, P/N Controls, and/or scheduled Work Orders). Maintenance events can be added to new or existing Work Orders.

1. Filter for Maintenance Events

2. Review Due Items for selected Aircraft

3. Assign Items to a Work Order

 

1. Filter for Maintenance Events

At the top of the window, add the desired filters by clicking the Filters but_filter_sort button. Then click the Find but_find_small button.

ePlanning-Fleet Due List

 

The following filters are available:
_____________________________________________________________________________________

Defect checkbox

Select this checkbox to filter by Defect Reports.

eMRO_V5_gold Note: The Planning Query forecasts factors in Flight Schedules when generating a forecast for open Defects against a particular A/C. Forecasts will be based upon a Flight Schedule. Once that Flight Schedule is surpassed, the forecast will then be based on the time the planning is run in calculation with the Schedule.

E/C checkbox

Select this checkbox to filter by E/C.

P/N E/C checkbox

Select this checkbox to filter by P/N E/C.

P/N Control checkbox

Select this checkbox to filter by P/N Control (i.e. TSO, REP, HYDRO).

W/O checkbox

Select this checkbox to filter by Work Order.

Note: When selected, the W/O Schedule Start Date Range field appear.

Display Task in W/Os checkbox

Select to display maintenance items that are already scheduled on a Work Order.

Note: When selected, the Linked W/O Start Date Range field appear.

Defect No Schedule checkbox

Select this checkbox to filter by Defects with No Schedule.

E/C No Schedule checkbox

Select this checkbox to filter by E/C No Schedule. Examples of No-Schedule E/Cs are: company convenience, do at next shop visit, etc.

P/N E/C No Schedule checkbox

Select this checkbox to filter by P/N E/Cs without a schedule. Examples of No-Schedule E/Cs are: company convenience, do at next shop visit, etc.

Open Revision E/C's checkbox

Select this checkbox to only show E/Cs that are in open revision.

Plan Element dropdown

All - Choose this option to query for Defects, E/Cs or P/N Controls with their respective plan checkboxes selected or not selected.

Checked - Choose this option to query for Defects, E/Cs or P/N Controls with their respective plan checkboxes selected.

Unchecked - Choose this option to query for Defects, E/Cs or P/N Controls with their respective plan checkboxes not selected.

Note: This dropdown depends on the setting of the Plan checkbox. (i.e. Plan, Plan E/C, Plan Defect)

Plan Elmnt Due Date

The Planning query will only return planning element items that are due before the date entered in this field.

Within Hours/Cycles/Days

The Planning Query will only return maintenance events that have a Remaining Schedule that is less than or equal to the specified number of Hours/Cycles/Days.

A/C Flight Hours eMRO_V5_gold

The Planning Query will forecast Due Dates based on the daily A/C Flight Hour utilization average defined in this field.

A/C Flight Cycles eMRO_V5_gold

The Planning Query will forecast Due Dates based on the daily A/C Flight Cycle utilization average defined in this field.

Multiple Occurrences checkbox

Select this checkbox to enter the amount of months to query for multiple E/C occurrences.

From Selection section

A/C drop down - Select the Aircraft associated to the records being queried. One or more record can be selected. There's also the Select All but_select all (planning) option, Deselect All option, and Filter but_filter_sort option to type in a specific record.

Company Filter checkbox eMRO_V5_gold - Select the Company Filter checkbox and the system will only retrieve E/Cs that share the same company as the aircraft selected in the A/C drop down.

Note: This is useful when an E/C is set up for one company and is effective and tracking on an A/C that belongs to a different company; the checkbox allows the user to run a fleet due list and isolate the results for a specific company. For example, E/C 1-2-3 has been set up for company A. E/C 1-2-3 is effective to A/C 001, however A/C 001 belongs to company B. If the user runs a fleet due list for A/C 001 and does not select the Company Filter checkbox, E/C 1-2-3 will appear in the results. If the user runs a fleet due list for A/C 001 and selects the Company Filter, because the system will only retrieve records for the company of the A/C entered, E/C 1-2-3 does not appear in the results.

A/C Type drop down - Select the aircraft Type associated to the records being queried.

A/C Series drop down - Select the aircraft Type and Series associated to the records being queried.

E/C drop down - Select the Engineering Control associated to the records being queried. One or more record can be selected. There's also the Select All but_select all (planning) option, Deselect All option, and Filter but_filter_sort option to type in a specific record.

E/C Sub drop down eMRO_V5_gold - Select the Sub E/Cs to be queried.

Note: At E/C creation, the Sub E/C field is used in determining the name of the E/C.

Chapter/Section drop down - Select the Chapter and Section associated to the records being queried.

P/N drop down - The Part Number reference for the aircraft part. Select the Part Number associated to the records being queried. Only one record can be selected. There's also the Filter but_filter_sort option to type in a specific record.

Customer drop down - Select the Customer associated to the records being queried. One or more record can be selected. There's also the Select All but_select all (planning) option, Deselect All option, and Filter but_filter_sort option to type in a specific record.

Company drop down - Select the Company associated to the records being queried.

Note: For more information, refer to the Multi Company Functionality.

W/O Location drop down - Enter the location of the Work Order for the forecast request.

Note: This drop down only appears when if the W/O checkbox is selected in the top of the window.

W/O Schedule Start Date Range - Enter the Schedule Start Date/Time (From - To) range of the Work Order for the forecast request.

Note: This filed only appears when the W/O checkbox is selected from the top of the window.

Linked W/O Start Date Range - Enter the Linked W/O Start Date (From - To) range for the forecast request.

Note: This filed only appears when the W/O checkbox is selected from the top of the window.

Planning Filters section

P/N S/N drop down - The Serial Number for the specific serialized part. Enter the Part Number/Serial Number for the forecast request. Only one record can be selected. There's also the Filter but_filter_sort option to type in a specific record.

NHA P/N eMRO_V5_gold - The part’s Next Higher Assembly P/N (if applicable). Only one record can be selected. There's also the Filter but_filter_sort option to type in a specific record.

E/C Category drop down - Enter the Engineering Control Category for the forecast request.

E/C Sub Category drop down eMRO_V5_gold - Enter the Engineering Control Classification Sub Category for the forecast request.

Note: E/C Sub Categories may be used to further define the E/C Category (e.g. ADs for engines, APUs, landing gear).

E/C Status drop down - Enter the Engineering Control Status for the forecast request.

Planner drop down - Select the Planner's name from the Employee Master. The Planner's name must be entered into the Planner field of the A/C Master, Optional 2 Tab. Only one record can be selected. There's also the Filter but_filter_sort option to type in a specific record.

Planned Location drop down - The Location associated to the maintenance item, such as the Work Order or Defect Location.

P/N Control drop down - Enter the Part Number Control for the forecast request.

E/C Classification drop down - Enter the Engineering Control Classification for the forecast request.

Defect Type drop down - The type of defect found on the aircraft (for example, Pilot Report, MX Report).

Defect Category drop down - The Defect Report's Category Code.

Defer Category drop down - Enter the Defer Category for the forecast request.

_____________________________________________________________________________________

 

2. Results are displayed

Then click the Find but_find_small button to view results.

 

3. Review Due Items for selected Aircraft

Click on the Add Task but_new_small button next to the desired maintenance event to access the aircraft's due items. From there, planners can assign each task to a new or existing Work Order. For more information, refer to Add Task Button.

Note: For more information on the details available in this window refer to the Add Task Button.

Note: Tasks with no schedule will not appear in the list.

 

4. Assign Items to a W/O

There are two options to assign a maintenance item to a W/O:

In This Section

A/C Totals, via ePlanning Fleet Due List Tab

Authorization Flag (ePlanning)

Due At (ePlanning)

E/C Called On Button (ePlanning)

Man Hours (ePlanning)

Mandatory Flag (ePlanning)

Part availability Button (ePlanning)

Planning Info Button (ePlanning)

Picklist All Button (ePlanning)

Schedule, Actual, and Remaining Hours/Cycles/Days. via ePlanning Fleet Due List Tab

Work Order Button (ePlanning)

Add Task Button (Planning)

See Also

ePlanning

Logging On / Logging Off

Dashboard Tab

Planning View Tab

Capacity Block Tab (Planning)

Capacity Tab

Unscheduled Tasks Tab

Top of Page Publication Date: 11/12/2024 Share Print