Publication Date: 11/12/2024
![]() ![]() ![]() ![]() |
||||||
PLNJOBACNO - Run Planning Jobs by Program Instead of Oracle SchedulerRun Planning Jobs by Program Instead of Oracle Scheduler Affected Window: w_ac_planning_qry
Switch Set to Yes: When set to Yes, the system will run Planning Jobs simultaneously in batches using the value entered in the Config Number field to determine the size of the batch. If the value in the Config Number field is between 1-60, the system will run jobs in the indicated batch size. When the value in the Config Number field is greater than 60, the system will default to running jobs in batches of 60. Note: If the value in the Config Number is null (0), the system will run jobs in batches of 20 as the default setting.
Switch Set to No: When set to No, the system will use the default Oracle Job scheduler to run and execute jobs. |
||||||
Top of Page |
Publication Date: 11/12/2024
![]() ![]() ![]() ![]() |
|||||