Publication Date: 11/12/2024 Share Print

Previous Topic

Next Topic

Book Contents

Book Index

PLNJOBACNO - Run Planning Jobs by Program Instead of Oracle Scheduler

logo_V5 big switch

Run Planning Jobs by Program Instead of Oracle Scheduler

Affected Window: w_ac_planning_qry

eMRO-PLNJOBACNO

 

Switch Set to Yes:

When set to Yes, the system will run Planning Jobs simultaneously in batches using the value entered in the Config Number field to determine the size of the batch. If the value in the Config Number field is between 1-60, the system will run jobs in the indicated batch size. When the value in the Config Number field is greater than 60, the system will default to running jobs in batches of 60.

eMRO_Planning_Yes

Note: If the value in the Config Number is null (0), the system will run jobs in batches of 20 as the default setting.

 

Switch Set to No:

When set to No, the system will use the default Oracle Job scheduler to run and execute jobs.

eMRO_Planning_No

See Also

Planning Switches

ACPLANQ - Number of Lines When Planning Prints Summary is Exported As Excel

ACROLAVG - Use A/C Rolling Average for Mean Hours and Cycles

ALWMULTTSK - Prevent Element From Being Added to a Work Order

APUMEAN - Mean APU Calculation

AUTOMANHOURSSCHEDULE - Allow AUTO_MANHOUR_SCHEDULE_JOB to Appear in Trax Database Jobs

AUTOTSKPRIORITY - Enables The Setup Of Auto Prioritize Task For Planning

CPYSCHFROMTRANS - Use Planning Transaction Schedule for T/Cs on Work Orders with a Line Status

DUEATPRJCT - Project the Due At Hours and Cycles Using the Mean Hours and Cycles

EMPATTSEQ - Employee Attendance Sign-On / Sign-Off Next Sequence

FLSCHDAYS - Run Using Flight Schedule Days Config Number

GLBLDUEDATECALC - Run Mean Hours / Run on Flight Due Date Calculation

INTERACTPLANMANHOURS - Interactive Planner Displays Man Hours per Location/Site

LBRBYHCNT - System Labor by Head Count

LivePlan - Enables the Live Planning Functionality

MANHOURSAUTOCOMP - Auto Complete Certain Fields in Man Hours Schedule Override

MANPLNFLF - Default Man Hour Schedule Planner to Location/Site of the Employee

MELDEFLOC - Deferred Defect Convert Reported/Deferred Day to Local Time Zone

OVNDATADAYS - Define Number of Days to Display in Overnight Station Report Tab

OVNTACMS - Overnight Station Default

PASTASCH - Create Past Absence Record

PLANBY - Allows You to Set Planning to Weekly or Monthly

PLANDEPT - Planning Department and Planning Sub Department Fields Mandatory

PLANDUE% - Planning Warning When Percent Due

PLANPNSEQ - Planning P/N Next Sequence Number

PLNAUTO7D - Activate Seven Day Forecast Automatically at Set Interval

PLNHISTML - Determine Planning History Time Limit

PLNJBDFLT - Default Planning Job Checkbox

PLNJOBQUE - Activate Planning Job by Java Queue

PLNTRNNO - Planning Transactions Sequence Number Can Only Be Changed By The Application

PN_EC_INSTDAYS - Count P/N E/Cs by E/C's Calendar Days or Part's Installed Days

SCHEDULEWORKG - Allow Work Group Selection Filter

SELFSCHLM - Self Assignment Schedule Date Range Limit

SHOPCAPNOT - Do Not Validate Against Shop Capability in the Shop Resource/Tasks Planner

SHOWDUEDT - Show Due Date Hours and Minutes

SHPPLNDLF - Default Shops Resource/Tasks Planner to the Location/Site in Employee Master

STREAMLINE - Clean Up Employee Schedules

TOEXITMS - Turn Off Exit Pop Up Message in Planning Query

TOOLWARN - Issues Warning If Tool Expires During W/O Scheduled Date Range

WOTCSCHDOVERWRITE - Overwrite existing W/O T/C Schedule Start/End Date with W/O Schedule Start/End Date

WOTRANSITCHECK - Automatic Transit Work Order Creation

YIELDCHECK - Validate W/O's Start Date is before E/C's Min Yield Date from Planning

Top of Page Publication Date: 11/12/2024 Share Print