Publication Date: 11/12/2024 Share Print

Previous Topic

Next Topic

Book Contents

Book Index

APUMEAN - Mean APU Calculation

Mean APU Calculation

Affected Window: w_ac_schedule_flight_eu_apu

eMRO-APUMEAN-0

 

Switch Set to Yes:

When set to Yes, APU Mean Hours and Cycles are calculated based on APU Readings.

eMRO_Planning_Yes

In the following example, Mean Hours and Cycles for APU installed on the selected A/C are generated based on manually recorded APU Readings in Technical Records.

eMRO-APUMEAN

 

Switch Set to No:

When set to No, APU Mean Hours and Cycles are calculated based on A/C Flight Hours and Cycles.

eMRO_Planning_No

In the following example, APU Mean Hours and Cycles are calculated based on A/C Actual Flights. Notice the Flight Range for the Actual Flights of an A/C can be selected through the Mean Flight/Cycle button from the A/C Schedule Flight APU window.

eMRO-APUMEAN-1

Note: If the Mean Flight/Cycle button is not displayed, check security settings.

After selecting the Save button, notice the APU Mean Hours/Cycles are generated based on the A/C Actual Flights recorded in Technical Records.

eMRO-APUMEAN-2

See Also

Planning Switches

ACPLANQ - Number of Lines When Planning Prints Summary is Exported As Excel

ACROLAVG - Use A/C Rolling Average for Mean Hours and Cycles

ALWMULTTSK - Prevent Element From Being Added to a Work Order

AUTOMANHOURSSCHEDULE - Allow AUTO_MANHOUR_SCHEDULE_JOB to Appear in Trax Database Jobs

AUTOTSKPRIORITY - Enables The Setup Of Auto Prioritize Task For Planning

CPYSCHFROMTRANS - Use Planning Transaction Schedule for T/Cs on Work Orders with a Line Status

DUEATPRJCT - Project the Due At Hours and Cycles Using the Mean Hours and Cycles

EMPATTSEQ - Employee Attendance Sign-On / Sign-Off Next Sequence

FLSCHDAYS - Run Using Flight Schedule Days Config Number

GLBLDUEDATECALC - Run Mean Hours / Run on Flight Due Date Calculation

INTERACTPLANMANHOURS - Interactive Planner Displays Man Hours per Location/Site

LBRBYHCNT - System Labor by Head Count

LivePlan - Enables the Live Planning Functionality

MANHOURSAUTOCOMP - Auto Complete Certain Fields in Man Hours Schedule Override

MANPLNFLF - Default Man Hour Schedule Planner to Location/Site of the Employee

MELDEFLOC - Deferred Defect Convert Reported/Deferred Day to Local Time Zone

OVNDATADAYS - Define Number of Days to Display in Overnight Station Report Tab

OVNTACMS - Overnight Station Default

PASTASCH - Create Past Absence Record

PLANBY - Allows You to Set Planning to Weekly or Monthly

PLANDEPT - Planning Department and Planning Sub Department Fields Mandatory

PLANDUE% - Planning Warning When Percent Due

PLANPNSEQ - Planning P/N Next Sequence Number

PLNAUTO7D - Activate Seven Day Forecast Automatically at Set Interval

PLNHISTML - Determine Planning History Time Limit

PLNJBDFLT - Default Planning Job Checkbox

PLNJOBACNO - Run Planning Jobs by Program Instead of Oracle Scheduler

PLNJOBQUE - Activate Planning Job by Java Queue

PLNTRNNO - Planning Transactions Sequence Number Can Only Be Changed By The Application

PN_EC_INSTDAYS - Count P/N E/Cs by E/C's Calendar Days or Part's Installed Days

SCHEDULEWORKG - Allow Work Group Selection Filter

SELFSCHLM - Self Assignment Schedule Date Range Limit

SHOPCAPNOT - Do Not Validate Against Shop Capability in the Shop Resource/Tasks Planner

SHOWDUEDT - Show Due Date Hours and Minutes

SHPPLNDLF - Default Shops Resource/Tasks Planner to the Location/Site in Employee Master

STREAMLINE - Clean Up Employee Schedules

TOEXITMS - Turn Off Exit Pop Up Message in Planning Query

TOOLWARN - Issues Warning If Tool Expires During W/O Scheduled Date Range

WOTCSCHDOVERWRITE - Overwrite existing W/O T/C Schedule Start/End Date with W/O Schedule Start/End Date

WOTRANSITCHECK - Automatic Transit Work Order Creation

YIELDCHECK - Validate W/O's Start Date is before E/C's Min Yield Date from Planning

Top of Page Publication Date: 11/12/2024 Share Print