The P/N E/C Authorization window allows the user to view all P/N E/Cs attached to serialized parts and update, edit, and override the authorization status, schedule, and actuals. When a P/N E/C is set up with 'Load at Receiving', the P/N E/C will load with a Pending authorization status and can then be updated in the P/N E/C Authorization window. Each customer will define their own steps for a P/N E/C authorization status process. Please note, the P/N E/C authorization status should not be confused with the actual P/N E/C status (i.e. Open, Terminated, N/A, Applicable/Not Embodied), or the status of the authorization steps to approve and release the E/C.

 

Query:

The following information/options are available in this window:
_____________________________________________________________________________________

Authorization Status

The Authorization Status of the P/N Control: Acknowledge, All, Authorized, Pending, or Unknown.

P/N

The Part Number reference for the aircraft part.

A/C

The individual aircraft tail number.

Installed A/C

When selected, the system will display all P/N E/Cs for all parts installed on-wing, regardless of the A/C.

Note: If the Installed AC checkbox is selected the system will ignore any entry made in the A/C field.

S/N

The Serial Number for the specific serialized part.

Location

The Location for maintenance events, inventory stores, orders, transactions, or training events.

_____________________________________________________________________________________

Results: 

The following information/options are available in this window:
_____________________________________________________________________________________

E/C

The Engineering Control that specifies aircraft or component scheduled maintenance intervals.

P/N

The Part Number reference for the aircraft part.

S/N

The Serial Number for the specific serialized part.

P/N E/C Authorization Status

The authorization status of the E/C for the P/N S/N.

Note: Based on each customer's authorization status process, these definitions may vary.

Acknowledge - Indicates the control has been acknowledged.

Authorized - Indicates the control has been authorized.

Pending - Indicates the control is pending.

Unknown - Indicates the control status is unknown.

Override checkbox

When selected, the user is able to override the schedule hours/cycles/days/date, and the earliest, repeat number, completed number, and effective date fields.

Note: If the override checkbox is left selected, the override status for that P/N S/N E/C is set to yes in the Engineering Effectivity Override window. If the main P/N E/Cs schedule is modified, any P/N S/N records that have the override set to yes will not be updated with the new P/E E/C schedule.

P/N E/C Status

The status of the E/C for the P/N S/N.

Applicable/Not Embodied - The E/C is applicable to an A/C Type/Series or Part Number, but may not be mandatory. This status allows the E/C to be entered in the system, but does not require compliance.

Cancel - The E/C has been cancelled.

N/A - The originating document (AD, SB, MOD, etc.) has been evaluated and is deemed not effective to a specific A/C or P/N.

Open - The E/C is Open.

Pending - This is the default status. This will be the status until the E/C is authorized. If the user requires holding this E/C until ready, it can be left as Pending even after the record has been saved. Once the E/C is authorized the status will show as Open.

Rejected - The E/C was rejected or not authorized and may need to be sent back through the authorization process for revision. This status should not be selected manually.

Terminated - The E/C is no longer in use. It has either been complied with for all effective aircraft or components, or the action of another E/C has terminated it. When an E/C is terminated, the termination applies to the entire fleet. This status should not be selected manually.

Reason

Free text reason.

Schedule Hours/Cycles/Days

The control's hours/cycles/days schedule, as applicable.

Actual Hours/Cycles/Days

The number of hours/cycles/days accumulated against the time control schedule.

Earliest

The Earliest checkbox option is selected if the E/C Schedule parameters are to be planned at the earliest occurrence. By selecting the Earliest checkbox, the schedule will be determined by which occurrence comes first: the Hours, Cycles, Days, or Date. For the latest occurrence, this checkbox should not be selected. This same logic is used independently by the parameters of the Effective Date-based Schedule (left) and of the Total Schedule (right).

Repeat NO

The parameter for the subsequent repetitive occurrences of the Engineering Control.

Completed NO

The number of times that the E/C has been complied with against the P/N.

Effective Date

The Effective Date is the date from which hours/cycles/days accumulate. It is used to calculate times accrued and due dates in the Planning Query.

_____________________________________________________________________________________

See Also

Technical Records, Update Menu

A/C Actual Flights (Flight Entry)

A/C Actual Flights Closing

A/C Controller Panel

A/C ECM

A/C Flight Schedule

A/C Flights Delay Update

A/C Initial P/N Load

A/C Initial P/N Load Multi

A/C Initial Template Load

A/C Log Book Master

A/C P/N Transaction

A/C P/N Transaction Audit

A/C P/N Transaction Supervisor

A/C Registration Change

A/C Units

Concession Registry

Defect Report

Defect Report Defer Authorization

Dent Mapping

Fault Code Report

P/N APU Reading

P/N Control Authorization

P/N Engine Recorder Reading

P/N N/L/A Creation

P/N N/L/A Installation and Removal

P/N Times Adjustment

Schedule Flight Plan

eTech Logbook