Publication Date: 11/12/2024 Share Print

Previous Topic

Next Topic

Book Contents

Book Index

GSE Engineering Control

The Engineering Control (GSE) option is provided for the creation of Engineering Controls (planned maintenance requirements) for the GSE.

This update window is also available in query mode where users can view the records provided in this window but cannot create new records or edit existing data. Refer to this module's Query menu.

The following tabs and buttons are available:

GSE Engineering Control Tabs

GSE Engineering Control Buttons

General Tab

Schedule Tab

Other Tab

E/C Content Tab

Optional Tab

Informational Tab

Revision History Tab

New button

Save button

Delete button

eMRO_but_Note_Main Notes button

Print button

Find button

but_compliance_sm Compliance button

Sub Functions

but_document_small Document button

but_gse_ctl_small GSE CTL button

P/N CTL button

but_task_card_control_small Task Card Control button

Task Card button

but_revision control (small) Revision Control button

Attachment button

but_renamecopy_sm E/C Rename/Copy button

The Export as Excel button can be selected to view the queried data (including all pages) in an Excel spreadsheet. This Excel file can be saved for later use. For more information refer to the Export as Excel Button via the eMRO System Standards manual.

The Filter/Sort filter sort button button is used to alter the search criteria for records associated with the host module and window. For more information, refer to Filter/Sort Button via the eMRO System Standards Module.

In This Section

GSE Engineering Control, General Tab

GSE Engineering Control, Schedule Tab

GSE Engineering Control, Other Tab

GSE Engineering Control, E/C Content Tab

GSE Engineering Control, Optional Tab

GSE Engineering Control, Informational Tab

GSE Engineering Control, Revision History Tab

GSE Engineering Control Buttons

See Also

GSE, Update Menu

GSE Engineering Compliance

GSE Initial P/N Load

GSE Initial Template Load

GSE Master

GSE Master Check In/Out

GSE P/N Master

GSE P/N Transaction

GSE Reading

eMRO GSE Task Card Selection

GSE Type/Series

GSE Utilization Schedule

GSE W/O

GSE W/O Closing

GSE W/O Task Card Work in Progress

Top of Page Publication Date: 11/12/2024 Share Print