Publication Date: 11/12/2024 Share Print

Previous Topic

Next Topic

Book Contents

Book Index

GSE Engineering Control, Revision History Tab

The GSE Engineering Control, Revision History tab displays the history of revisions for the currently selected GSE Engineering Control.

eMRO-GSE Engineering Control, Revision History tab

 

The following information/options are available in this window:
_____________________________________________________________________________________

E/C

The Engineering Control that specifies aircraft or component scheduled maintenance intervals.

Revision

The revision number of the E/C. This can be alpha numeric. When the revision is changed and saved, the system will prompt the user with a revision control record, where the changes made for the specific revision can be saved for auditing purposes. The 'Revised By' field will be automatically updated with the user's user code, and the revision date can be set as required.

Revised Date

The date the E/C was put into revision (if E/C is currently in revision), or the date the final authorization step was completed in the E/C revision authorization process.

Authorized Date

The date the record was authorized.

Authorization Action

The action taken against the authorization of the E/C Revision, including Accepted, Rejected, etc.

Description

The description of the reason for the revision. This can be edited at a later time, but not after it has been authorized.

_____________________________________________________________________________________

See Also

GSE Engineering Control

GSE Engineering Control, General Tab

GSE Engineering Control, Schedule Tab

GSE Engineering Control, Other Tab

GSE Engineering Control, E/C Content Tab

GSE Engineering Control, Optional Tab

GSE Engineering Control, Informational Tab

GSE Engineering Control Buttons

Top of Page Publication Date: 11/12/2024 Share Print