GSE Engineering Control, Other Tab

The GSE Engineering Control, Other Tab allows the user to enter additional, optional, information for an GSE E/C.

eMRO-GSE Engineering Control, Other tab

 

The following information/options are available in this window:
_____________________________________________________________________________________

E/C Superseded By

The E/C entered in this field supersedes the original E/C selected into. This feature is used to phase in one E/C and phase out and terminate the current E/C selected. The E/C that is being superseded will be identified as such (flagged in red text) on the E/C General Tab.

E/C Superseded Date

The date that the superseding E/C takes effect.

Internal Capability checkbox

This checkbox indicates hat the work can be carried out internally as opposed to having a third party maintenance organization carry it out. This field is informational only.

Mod NO

Modification Numbers for E/Cs. This field is informational only.

Effectivity NO

This does not relate to A/C or E/C Effectivity. This field is informational only.

Ground Time Require

The amount of time needed for an aircraft to be on the ground in order to comply with the E/C. The time format is user defined by hours (0.00). This information appears on the A/C Planning Query results window as GTR (Ground Time Required).

Capability Area

The Capability Area identifies where a maintenance task can be accomplished in association with the customer's internal capabilities (e.g., a particular E/C can only be accomplished during a heavy maintenance visit at a heavy maintenance capable Site). The Capability Area can be assigned for E/Cs, P/N Controls, and Defect Reports. However, a maintenance task with any Capability Area can be scheduled on Work Orders at Sites that have their Capability Area set to 'ALL'. For more information regarding the Capability Area, refer to the Capability Area section of the Planning Transaction Code Manual.

Maintenance Program

The part's associated Maintenance Program.

Repair / Alteration

Defines if the record requires Repair or Alteration.

_____________________________________________________________________________________

See Also

GSE Engineering Control

GSE Engineering Control, General Tab

GSE Engineering Control, Schedule Tab

GSE Engineering Control, E/C Content Tab

GSE Engineering Control, Optional Tab

GSE Engineering Control, Informational Tab

GSE Engineering Control, Revision History Tab

GSE Engineering Control Buttons