Publication Date: 11/12/2024 Share Print

Previous Topic

Next Topic

Book Contents

Book Index

E/C, via Due List

logo_V7_Big

The Engineering Control that specifies aircraft or component scheduled maintenance intervals.

ec

When an E/C is selected, users can view all pertinent information related to an Engineering Control from the E/C Detail. Users can also add an E/C to a Work Order using the New W/O button and the Existing W/O button.

ec-1

The following tabs are available:

See Also

Planning Results, via Due List

A/C Totals, via Due List

Advance Filter Button, via Due List

Authorization Flag (Open Revision E/C), via Due List

Capability Area, via Due List

Category, via Due List

Due At, via Due List

E/C Called On Button, via Due List

E/C Type, via Due List

ETOPS Designation, via Due List

Internal checkbox, via Due List

Last Compliance, via Due List

Limit Schedule Icon, via Due List

Mandatory Flag, Due List

Man Hours, via Due List

Mix Schedule Button, via Due List

Parent E/C Button, via Due List

Part Status Indicator Button, via Due List

Planning Info Button, via Due List

Plan Notes Button, via Due List

Reservation Status Indicator Button, via Due List

Schedule, Actual, Remaining Hours/Cycles/Days, via Due List

Sub Category, via Due List

Tool Status Indicator Button, via Due List

Transaction Notes Button, via Due List

Troubleshooting Category, via Due List

W/O Flag, via Due List

Top of Page Publication Date: 11/12/2024 Share Print