PLANNING CONTROL > Due List, via Planning Control > Planning Results, via Due List > Part Status Indicator Button, via Due List
Part Status Indicator Button, via Due List
The Part Status Indicator button displays parts available in inventory, on order, or reserved for a particular location (partial/all/none).

Note: Planning will always show that it requires the same part as if it were being replaced for P/N Controls.
Note: Parts will not be reserved for P/N Controls unless a Task Card is attached to that part.
Select the Part Status Indicator button to open the Parts/Tools Table window. All available parts and related information is displayed in this window.

The following information/options are available in this window: _____________________________________________________________________________________
Part Status Indicator button
The green status button displays that all spares required are available in inventory.
Part Status Indicator button
The yellow status button displays that some, but not all spares are available in inventory.
Part Status Indicator button
The red status button displays that no spares are available in inventory.
Create Requisition button
Select to create a requisition for all required parts.

_____________________________________________________________________________________
Part Requirements:
The Part Status Indicator button appears when material requirements exists for the E/C or P/N Control Task Card or Defect Report.
Notice a material requirement exist for this defect through the Defect Report window in the P/N Requirement List tab. The required P/N quantity is available so the Part Status Indicator button displays the green indicator.

When Defects are queried through Planning Control via the Fleet Due List tab the Part Status Indicator button also displays the green indicator.

See Also Planning Results, via Due List A/C Totals, via Due List Advance Filter Button, via Due List Authorization Flag (Open Revision E/C), via Due List Capability Area, via Due List Category, via Due List Due At, via Due List E/C, via Due List E/C Called On Button, via Due List E/C Type, via Due List ETOPS Designation, via Due List Internal checkbox, via Due List Last Compliance, via Due List Limit Schedule Icon, via Due List Mandatory Flag, Due List Man Hours, via Due List Mix Schedule Button, via Due List Parent E/C Button, via Due List Planning Info Button, via Due List Plan Notes Button, via Due List Reservation Status Indicator Button, via Due List Schedule, Actual, Remaining Hours/Cycles/Days, via Due List Sub Category, via Due List Tool Status Indicator Button, via Due List Transaction Notes Button, via Due List Troubleshooting Category, via Due List W/O Flag, via Due List |
|