Due At, via Due List

The Due At gives the user information about when the planning element item(s) become due.

Planning Control-Due At

 

The following information/options are available in this window:
_____________________________________________________________________________________

Due Date

The calculated due date of the item (rounded to the nearest date). Planning will calculate the due date based on the number of remaining hours and/or cycles factored by the mean hours set-up for each aircraft.

Note: When Planning switch SHOWDUEDT is set to Yes, the time of day will be included along with the Due Date. When set to No, the time will not be included. For more information, refer to SHOWDUEDT in the Planning Training Manual.

Note: For Defect Reports, the Due Date in Planning will appear red based on the time/date entered in the Defer Due Date, HR, MN fields, and the Discovery checkbox selection. If the Day of Discovery checkbox is selected the user will have until the end of day on the Due Date before the planning event is overdue. If the Day of Discovery checkbox is de-selected the planning event will be overdue at beginning of the day on the Due Date. These configurations are made in the Defer tab, via Defect Report Detail window in the core system.

Min Yield Date logo_V7_small

The Min Yield Date is calculated based on the Min Yield % of the E/C via the Engineering Control, Schedule tab in the core system. The Min Yield % field is used to make planners more effective so as not to perform an E/C too early. For example, if an E/C has a schedule of 100 days with a Min Yield % of 90% when the E/C has accumulated 90 days of actual time (usage from the last compliance) the planner will be flagged in Planning via the Due Date/Min Yield Date.

Note: When the Planning switch YIELDCHECK is set to Yes, the Planning Control app will prevent an Engineering Control from being added to a Work Order if the E/C's Min Yield Date is before the W/O's Start Date. For more information, refer to YIELDCHECK in the Planning Training Manual.

Max Yield Date logo_V7_small

The Max Yield Date is calculated based on the Max Yield % of the E/C via the Engineering Control, Schedule tab in the core system. The Max Yield Percentage in planning calculates a date the planners do not want to surpass based on the max percentage from Engineering (even though this date is not technically the E/C’s Due Date). For example, if an E/C has a schedule of 100 days with a Max Yield of 95% when the E/C has accumulated 95 days of actual time (usage from the last compliance) the planner will be flagged in Planning via the Max Yield Date.

Due At A/C (Hours/Cycles)

The Aircraft Hours/Cycles that the item is due at.

Remain HRS/CYC

The system automatically calculates based on the mean hours and cycles per day, the remaining hours and cycles which can be flown on that Due Date without the maintenance event being overflown. For example, with a remaining schedule of 100 and the A/C has mean hours/cycles of 9.33 hours /5 cycles, this means that with 10 days left, the A/C should have 93.3 hours as of the Due Date. Therefore, the A/C has 6.33 hours of flight time before the maintenance event becomes overdue.

Concession Planning Control-Concession button

The Concession button displays when there is a current concession affecting the item. There may be several Concessions pending on the same item. Select the Concession button to view details of the concession(s). For more information regarding Concessions, please refer to the Concession Registry section of the Technical Records Manual.

Planning Control-Concession-1

Note: This window is informational only.

_____________________________________________________________________________________

 

Hours Remaining

Divided By

Mean Hours

Equals

Number of Factored Days

1000

/

10.00

=

100.00

TRAX will add the factored number of days to today's date (the day on which the planning query is run) to come up with the due date:

Today's Date

Plus

Factored Days

Equals

Due Date

06/05/2019

+

100

=

08/23/2019

Note: There is a different calculation for calendar day driven items. These will have their due date calculated by adding the remaining number of days to today's date.

Go to Engineering/ Update/ Engineering Control Selection/ Schedule Tab.

In this example, the First Schedule Days and Repeat Schedule was reset to 500 days. The Warning % due is 80%.

ePlanning-Due At-2

The color of the Due Date indicates how many days till the planning event is due or is past due.

ePlanning-Normal - Warning % Due is between 0-89 days of being due.

ePlanning-Yellow - Warning % Due is within 10 days of being due.

ePlanning-Overdue - Warning % Due is 1 or more days past being due.

Either the A/C Schedule Flight option or the A/C Schedule Flight Daily option stores the averages for each A/C in the fleet. The A/C Schedule Flight option is used for average flying time for user specified date ranges. The A/C Schedule Flight Daily option is used for actual flying time per day.

Planning Control-Due At-1

When performing the forecast for the Due Date, the system will round to the nearest day, before the element becomes overdue. When rounding to the day, there may be a remainder of Hours and Cycles, which will appear in the Remain HRS/CYC field. For example, if the Remaining HRS/CYC displays 5:15; this indicates that there are 5 hours and 15 minutes left over from the forecasted due date.

Note: This should not be confused with the Remaining Time (the Hours/Cycles/Days remaining against the item).

This information is used by the Planner to utilize as much of the item's schedule as possible. Note that this should not be confused with the Remaining Time (the Hours/Cycles/Days remaining against the item).The field will indicate if the item is overdue in red.

The Due Date will appear in yellow if the item has surpassed "X" percentage of its schedule.

Note: This percentage can be overridden via Engineering/ Update/ E/C/ Schedule Tab/Warning Percent Due field. The Config Other field is used.

  • ACROLAVG - (Use A/C Rolling Average For Mean Hours And Cycles): If set to Yes, a rolling average is calculated for the mean hours and cycles calculation that is generated via Planning/ Update/ A/C Schedule Flight. For more information, refer to ACROLAVG in the Planning Training Manual.

See Also

Planning Results, via Due List

A/C Totals, via Due List

Advance Filter Button, via Due List

Authorization Flag (Open Revision E/C), via Due List

Capability Area, via Due List

Category, via Due List

E/C, via Due List

E/C Called On Button, via Due List

E/C Type, via Due List

ETOPS Designation, via Due List

Internal checkbox, via Due List

Last Compliance, via Due List

Limit Schedule Icon, via Due List

Mandatory Flag, Due List

Man Hours, via Due List

Mix Schedule Button, via Due List

Parent E/C Button, via Due List

Part Status Indicator Button, via Due List

Planning Info Button, via Due List

Plan Notes Button, via Due List

Reservation Status Indicator Button, via Due List

Schedule, Actual, Remaining Hours/Cycles/Days, via Due List

Sub Category, via Due List

Tool Status Indicator Button, via Due List

Transaction Notes Button, via Due List

Troubleshooting Category, via Due List

W/O Flag, via Due List

Top of Page Publication Date: 11/12/2024 Share Print