Planning Info Button, via Due List

Select the Planning Info but_Planning Info Transaction_Planning Control button to view the Planning Transaction Window. In this pop-up window, the Planned Start Date is defaulted from the Due Date or the date as defined by the Planning Lead Days on the record's Engineering Control, Schedule Tab. The user can override this Planned Date as required. Notice that the default Planned Start Date is the same as the Due Date in the screenshot below.

Planning Control-Planning Transaction button-0.1

The user can override this Planned Date by selecting a new Planned Start Date/Planned End Date and selecting the Save button.

Planning Control-Planning Transaction button-1

To add any notes select in the Note box and select the Save button. The Note is then added to the Planning Event.

The Planned Date, and any associated notes, will be cleared once the Work Order associated with the planned item is 'Closed' or manually complied with.

 

The following information/options are available in this window:
_____________________________________________________________________________________

Save button

Select this button to save changes made in the Planning Transaction window.

A/C

The individual aircraft tail number.

E/C

The Engineering Control that specifies aircraft or component scheduled maintenance intervals.

P/N

The Part Number reference for the aircraft part.

P/N S/N

The Serial Number for the specific serialized part.

Planned Start Date

This is used with the Work Order Planning Element. Enter the W/O Planned Start Date.

Planned End Date

This is used with the Work Order Planning Element. Enter the W/O Planned End Date.

Planned Start Hrs/Min

This is used with the Work Order Planning Element. Enter the W/O Planned Start Hrs/Min.

Planned End Hrs/Min

This is used with the Work Order Planning Element. Enter the W/O Planned End Hrs/Min.

Planned Location

The location in which the Work Order is going to take place.

Group

Select the shift group from the drop down menu to work on the planned item.

_____________________________________________________________________________________

 

The color of the Planning Date field will change based on the Planning Transaction Conditions via the Planning Transaction code manual.

Planning Control-Planning Transaction button-3

See Also

Planning Results, via Due List

A/C Totals, via Due List

Advance Filter Button, via Due List

Authorization Flag (Open Revision E/C), via Due List

Capability Area, via Due List

Category, via Due List

Due At, via Due List

E/C, via Due List

E/C Called On Button, via Due List

E/C Type, via Due List

ETOPS Designation, via Due List

Internal checkbox, via Due List

Last Compliance, via Due List

Limit Schedule Icon, via Due List

Mandatory Flag, Due List

Man Hours, via Due List

Mix Schedule Button, via Due List

Parent E/C Button, via Due List

Part Status Indicator Button, via Due List

Plan Notes Button, via Due List

Reservation Status Indicator Button, via Due List

Schedule, Actual, Remaining Hours/Cycles/Days, via Due List

Sub Category, via Due List

Tool Status Indicator Button, via Due List

Transaction Notes Button, via Due List

Troubleshooting Category, via Due List

W/O Flag, via Due List

Top of Page Publication Date: 11/12/2024 Share Print