Publication Date: 11/12/2024 Share Print

Previous Topic

Next Topic

Book Contents

Book Index

W/O Flag, via Due List

The Work Order flag indicates that the current planning element is associated to a Work Order. The Work Order will be associated to one aircraft. Multiple Work Orders can be assigned to a planning element. Additionally, the Work Order may be associated to several different planning elements.

Planning Control-WO

  

The following information/options are available in this window:
_____________________________________________________________________________________

W/O

The Work Order used to categorize, manage, and schedule work requirements for aircraft maintenance. If the planning element is overdue, the W/O field will be highlighted in red. If a planning element is linked to two or more Work Orders a number will appear beside the W/O field. The W/O displayed is the one with the closest Scheduled Start Date.

logo_V7_small Note: The Work Order will be highlighted in red if the Due At date is earlier than the W/O's Start Date.

plan-wo

To view a list of W/Os tied to a planning element, select the number hyperlink adjacent to the W/O number.

logo_V7_small Note: The Work Order list will display W/Os in hierarchical order with the one with the closest Scheduled Start Date listed first.

plan-wo-1

W/O but_Work Order_Planning Control button

Once a record has been assigned to a Work Order, the Work Order button will appear with the Work Order information on that record. When selected, the W/O pop-up window is displayed with the same functions as the Work Order via Production/Update/Work Order. For more information, refer to the W/O button.

Reservation Status Indicator Planning Control-Reservation-blue button

The display of the Reservation Status Indicator button allows planners to see when a part(s) has been reserved (all/partial/none). For additional information, refer to the Reservation Status Indicator button.

Part Status Indicator Part Availibity Green_Planning Control button

Select the Part Status Indicator button to display parts available in inventory, on order, or reserved for a particular location (partial/all/none). For additional information, refer to the Part Status Indicator button.

Man Hours

The number of Man Hours needed to complete the applicable tasks. The Hours displayed will include all MECH, INSP, and DUPLICATE INSP hours associated with the tasks.

Location

The Location for maintenance events, inventory stores, orders, transactions, or training events.

Site

The Site where the work should be carried out (if applicable).

Schedule Start Date/Time

The date/time that the work is scheduled to begin. The Start Date does not affect whether the Work Order may be deleted or not. However, if the work has been started, the Work Order may not be deleted.

Schedule Completion Date/Time

The date/time that the work is scheduled to be completed.

ETOPS Designation logo_V7_small

The ETOPS designation Indicates that the the W/O maintenance procedure contains a task or tasks that affect the aircraft’s ETOPS airworthiness and reliability qualification status.

44-WO-Flag-via-Due-List-Window-ETOPS-designator

_____________________________________________________________________________________

In This Section

W/O Button, via Due List

See Also

Planning Results, via Due List

A/C Totals, via Due List

Advance Filter Button, via Due List

Authorization Flag (Open Revision E/C), via Due List

Capability Area, via Due List

Category, via Due List

Due At, via Due List

E/C, via Due List

E/C Called On Button, via Due List

E/C Type, via Due List

ETOPS Designation, via Due List

Internal checkbox, via Due List

Last Compliance, via Due List

Limit Schedule Icon, via Due List

Mandatory Flag, Due List

Man Hours, via Due List

Mix Schedule Button, via Due List

Parent E/C Button, via Due List

Part Status Indicator Button, via Due List

Planning Info Button, via Due List

Plan Notes Button, via Due List

Reservation Status Indicator Button, via Due List

Schedule, Actual, Remaining Hours/Cycles/Days, via Due List

Sub Category, via Due List

Tool Status Indicator Button, via Due List

Transaction Notes Button, via Due List

Troubleshooting Category, via Due List

Top of Page Publication Date: 11/12/2024 Share Print