Publication Date: 11/12/2024 Share Print

Previous Topic

Next Topic

Book Contents

Book Index

P/N Control Actuals Calculation: Scenario 1

When a Part Number Control has a Reset Date that predates the P/N being entered into the system Inventory, the P/N Control Actuals will not be affected until the P/N Serial Number is installed into an Aircraft (unless the P/N is Calendar or Date Controlled). P/N Actuals will not be accumulated if the P/N is not installed on an A/C.

For example, create a P/N Control with a retroactive Reset Date (see below).

eMRO-Scenario 1 PN Control

For more information regarding P/N Controls and how to create them refer to the P/N Control Button of the P/N Master window via the Settings Training Manual.

Note: A P/N Control is retroactive when its Reset Date precedes its Created Date.

Notice the P/N Control Created Date.

eMRO-Scenario 1 PN Control-1

Create a Purchase Order and receive the P/N into Inventory.

eMRO-Scenario 1 PN Control-2

Through the P/O Receiving, enter a retroactive Reset Date (04/26/2009) for the P/N Control. Notice it predates the Created Date (04/26/2020).

eMRO-Scenario 1 PN Control-3

For more information regarding the P/N Inventory Control window refer to Receiving a Time Controlled Part via the Receiving Training Manual.

Note: The Reset Date will default to the current date automatically within the P/N Inventory Control window. The retroactive Reset Date must be edited manually.

From the P/N Inventory Control window via Inventory Detail, P/N Control button, notice that there are no Actuals against P/N Control. This is because the P/N was just received into inventory and has not yet been installed onto an aircraft.

eMRO-Scenario 1 PN Control-4

For more information on the P/N Inventory Control window refer to the Control Button via the Inventory Training Manual.

P/N Control Actuals will begin to accumulate once the part is installed on an aircraft for P/N Controls which are not Calendar or Date controlled. Refer to the following for a detailed example on how P/N Control Actuals are affected through multiple A/C Installations and Removals.

Via the Inventory Detail, A/C P/N Transaction tab, notice that the P/N S/N was installed (04/26/2021) on an A/C (11-4604) after the P/N Control Reset Date (04/26/2020).

eMRO-Scenario 1 PN Control-5

Several flights were created for the same Aircraft (11-4604) after the Installation of the P/N as viewed from the Technical Records/ Print/ A/C Logs Print window.

eMRO-Scenario 1 PN Control-6.1

Note: The Technical Records/ Update/ A/C Actual Flights Closing must be performed for the A/C Total Times to be reflected against the P/N Control Actuals.

From the P/N Inventory Control window, notice that the P/N Control Actuals are the same as the amount of A/C Total Hours accumulated through the scheduled flights above.

eMRO-Scenario 1 PN Control-7

Remove the P/N from the Aircraft.

eMRO-Scenario 1 PN Control-8

Install the same P/N Serial Number onto a different Aircraft (350-1).

eMRO-Scenario 1 PN Control-9

Additional flights were created for a different Aircraft (350-1) after the installation of the P/N as viewed from the Technical Records/ Query/ A/C Actual Flight window.

eMRO-Scenario 1 PN Control-10

After the flights are closed through the A/C Actual Flights Closing, the A/C accumulated times for both installations of the part are added together and reflected in the P/N Control Actuals (see below diagram for calculation).

 

Hours/Minutes

Cycles

Total Time for A/C: 11-4604

2:05

2

Total Time for A/C: 350-1

0:55

1

P/N Control Actuals

3:00

3

From the P/N Inventory Control window, notice the P/N Control Actuals reflect the A/C Total Times for both A/C installations combined.

eMRO-Scenario 1 PN Control-11.0

Note: The Installed hours above reflect the current installation. When the part is removed from the A/C the Installed fields will be blank. Actuals, however, will accumulate until the Control is reset against a Repair Order or at Receiving.

See Also

eMRO Part Number Controls Actuals Calculations

P/N Control Actuals Calculation: Scenario 2

P/N Control Actuals Calculation: Scenario 3

P/N Control Actuals Calculation: Scenario 4

P/N Control Actuals Calculation: Scenario 5

P/N Control Actuals Calculation: Scenario 6

P/N Control Actuals Calculation: Scenario 7

Top of Page Publication Date: 11/12/2024 Share Print