Publication Date: 11/12/2024 Share Print

Previous Topic

Next Topic

Book Contents

Book Index

Control - E/C Button, via Receiving Inspection Detail

eMRO_V5_gold

When the Control - E/C button is selected, the Control - P/N E/C window displays P/N Controls and P/N E/Cs linked to a part. Depending on if the part being received is from a Repair Order or if it is a new part entering the system, the following processes are in effect:

  • Repair Orders: During the Receiving Inspection (R/I) of a part that was received on a Repair Order, the user must ensure the Select checkbox is selected for each control that was actioned while the part was on repair and enter the Reset Date found on the part certification. The Actuals cannot be edited for parts received on an R/O. Compliance for controls against an R/Os will be triggered by selecting the Select checkbox, not the Compliance checkbox (see table below).

    control pn1

    eMRO_V5_gold Note: P/N E/Cs that are Position Controlled will be displayed in this window even if their Status is 'N/A' (which indicates that the Serial Number is not presently installed in the specified A/C Position). Including position-controlled P/N E/Cs that are 'N/A' ensures that the necessary controls are reviewed throughout the repair process. To ensure that all position-controlled P/N E/Cs for the part are displayed in this window, Receiving switch PNECPOSCONT must be set to Yes. For more information on position-controlled parts, refer to the Positioning Control Button, via Engineering Control P/N, General Tab.

  • New Parts (P/O, L/O, EX): During the Receiving Inspection (R/I) of a part that was received on a Purchase Order, Loan Order, or Exchange Order, the user can enter the Reset Date (effective date) and update the Actuals (Hours/Cycles/Days), as required. Compliance for P/N E/Cs against P/Os, L/Os, and E/Xs will be triggered by selecting the Compliance checkbox, not solely the Select checkbox (see table below). These steps are optional for these types of orders; refer to below note.

    control pn2

Keep in mind, the Control - E/C button can be selected only while the 'Pending' or 'Accepted' Status radio buttons are selected in the R/I Detail window. The Pending radio button has been added to the Receiving Inspection window. This status option allows users to review/edit the P/N Controls and P/N E/Cs of the part without updating the Control tables. The tables will not be formally updated until the R/I status is changed to Accepted and saved. When the 'Accepted' Status radio button is selected and the Control - E/C button is selected, a red message appear stating that any changes made while the Status is 'Accepted' will update the Control tables. For more information refer to R/I Pending Status and Updating Controls.

Note: Under the following Receiving Inspection circumstances, the Reset Dates will be set by default and access to this window will be optional:

- If the part is not linked to an order and is in a Quarantine Location with Condition 'U/S' (unserviceable). In the R/I window the Location and Condition can be updated to serviceable locations/statuses and the R/I can be Accepted without having to select the Control-E/C button.

- If the part entered the system through a P/O, E/X, or L/O, the system will populate the reset dates and values automatically. The R/I can be Accepted without having to select the Control-E/C button.

Note: In eMRO version 5 and later releases the Control button, P/N E/C button, and Repair Order Control tab have been replaced by the Control - E/C button. If a part has been received from an R/O and during R/I the P/N Control or P/N E/C actuals or schedule need to be adjusted, the user will need to make the necessary updates via the P/N Control Authorization or P/N E/C Authorization windows.

logo_V7_small Note: The R/I window will automatically update to reflect any changes made to the engineering control's status while the order is in transit.

logo_V7_small Note: If Switch INSPOVRENG is set to Yes, the system will override overdue controls and will not display the associated overdue hard warning. For more information, refer to INSPOVRENG, via Receiving Switches.

Receiving Process

The following information/options are available in this window:
_____________________________________________________________________________________

Select All /Deselect All button

Select or deselect all P/N Controls and P/N E/Cs.

Notes eMRO_but_Note_Main button logo_V7_small

Select the Notes eMRO_but_Note_Main button to enter any notes that will be associated with the currently selected record. For more information, refer to Notes Button, via Standard Buttons.

Expand but_expand_right_emro button/Collapse but_expand_down_emro button

Select the Expand but_expand_right_emro button to expand the P/N line for a tree view of all associated Controls and relevant information. Select the Collapse but_expand_down_emro button to collapse the tree.

P/N

The Part Number reference for the aircraft part. Please note that any additional Part Numbers which may appear on this tab may be NLA to the NHA which appears on the Report Order Detail, General tab. ALL NLA component controls will appear under the appropriate P/N S/N.

S/N

The Serial Number for the specific serialized part.

P/N Description

The description of the part.

Select checkbox

Select this checkbox to make the control effective to the part. Once selected, the Reset Date must be updated to match the part's certification. (Refer to the Reset Date below.)

  • Repair Orders: When performing R/I on a Repair Order, the Select checkbox must be selected for the P/N E/Cs being complied with and to be able to reset the times.
  • Non-R/O Order Types: When performing R/I on a new part (P/O, L/O, or E/X), this checkbox is selected automatically as per the configurations for the P/N E/C in the Engineering module. To perform compliance on a P/N E/C for non-R/O order types, the Complied checkbox must be used. See Complied checkbox below.

Print checkbox

If the print checkbox was selected in the repair order (in order for the control to appear on the repair order print), the print checkbox will be selected in this Control - P/N E/C window.

Control

The time control related to the part (e.g., TSN, TSO, etc.) used to define its limits. Controls with red text are mandatory.

P/N E/Control button - This button indicates that the control is a P/N E/C. Users may select this button to view the P/N E/C, as it appears in the Engineering Control window.

P/N Control button - This icon indicates that the control is a P/N Control. The icon is an informational flag only. All P/N Controls are defined as P/N Control Codes in the system transaction codes (via Settings/ Explorer) and attached to the Part Number via the Settings/ Update/ P/N Master, P/N Control button.

Reset Date

Date and time at which control information was reset for having been performed/complied. The Reset Date field must be entered manually, and the date is mandatory when saving this window while the R/I Control is set to 'Accepted' status.

logo_V7_small Note: Users can save this window without populating the Reset Date field.

Actual Hours/Cycles/Days

The number of hours/cycles/days accumulated against the time control schedule.

Actual Removals

The number of removals which have occurred for the component. With every removal, the P/N Removal Actual value increments.

Schedule Hours/Cycles/Days

The control's hours/cycles/days schedule, as applicable.

Schedule Date

The scheduled due date for the record.

logo_V7_small Note: Users can freely edit the information in this field.

Schedule Removals

The number of component removals to occur before performing the maintenance requirement.

Complied checkbox

Select the Complied checkbox if the E/C has been complied with. This checkbox is only available if performing R/I on parts received from a P/O, L/O, E/X.

Note: If performing compliance on a part from a Repair Order, compliance is registered and times are reset by selecting the P/N E/Cs through the Select button. See Select checkbox above.

Status drop down logo_V7_small

Select the status of the E/C.

Open - The E/C control is open.

Cancel - The E/C control has been canceled.

N/A - The E/C control is considered to be not applicable.

Pending - The E/C control is currently pending. The pending status option is not applicable for R/Os.

Rejected - The E/C control has been rejected.

Terminated - The E/C control has been terminated. The terminated status option is not applicable for R/Os.

logo_V7_small Note: The status drop down will appear regardless if the complied checkbox is selected and will auto-populate with a status corresponding to the information entered in the Engineering Effectivity Override window. Additionally, only selected controls with an Open status will have compliance performed against them.

Description

The description of the Control. This description appear beneath the Control code. The P/N Control descriptions are defined in the code itself via Settings/ Explorer/ System Transaction Code. The P/N E/C descriptions are defined via the Engineering/ Update/ Engineering Control, General tab.

Deferred at RI Reason

When a non-mandatory control is deselected, the 'Deferred at RI Reason' field appears allowing the user to defer the control and continue with the R/I process. Refer to the Mandatory vs Non-Mandatory Controls section below.

eMRO_V5_gold Note: When Receiving switch RIDEFEROP is set to Yes, the Deferred at RI Reason field is optional when a control is deselected. For more information refer to RIDEFEROP via the Receiving Switches Manual.

Calendar Control checkbox

When the Calendar Days/Control checkbox is selected, planning calculates the controls due date based on calendar days starting from the controls Effective Date (reset/last compliance date). When the Calendar Days/Control checkbox is not selected, planning calculates the controls due date starting from the associated P/N S/N installed date (if the P/N S/Ns installed date is after the controls Effective Date).

Revision

The controls current revision.

Revised By

The user's ID that revised the current revision.

Rev Name

The users's name that revised the current revision.

Revised Date

The date the current revision was accepted.

Issued By

The vendor or authority (i.e. FAA, JAA Task Card.) who issued the E/C.

Complied By

The user that created the last compliance record for the control.

Complied Date

Date and time at which control information was reset for having been performed/complied.

_____________________________________________________________________________________

 

Mandatory vs Non-Mandatory Controls

Mandatory controls (appearing in red text) cannot be deselected and must be actioned.

However, non-mandatory controls can be deselected if they were not complied with during the repair process. Upon deselecting the checkbox a 'Deferred at RI Reason' field appears allowing the user to defer the control and continue with the R/I process.

eMRO_V5_gold Note: When Receiving switch RIDEFEROP is set to Yes, the Deferred at RI Reason field is optional when a control is deselected. For more information refer to RIDEFEROP via the Receiving Switches Manual.

In This Section

R/I Pending Status and Updating Controls

Engineering Order Button, via Control - E/C Button

See Also

Receiving Inspection Detail Buttons

Notes Button, via Receiving Inspection Detail

Tear Down Button, via Receiving Inspection Detail

N/L/A Button, via Receiving Inspection Detail

NHA PN Button, via Receiving Inspection Detail

Attachment Button, via Receiving Inspection Detail

Forms Button, via Receiving Inspection Detail

Print Button, via Order Receiving Discrepancy

Receiving Discrepancy Button, via Receiving Inspection Detail

Top of Page Publication Date: 11/12/2024 Share Print