Publication Date: 11/12/2024
![]() ![]() ![]() ![]() |
||||||
The Schedule Control tab and Schedule Control By tab are used to set up parent/child relationships between shop P/N E/Cs. Compliance against the parent shop P/N E/C triggers transactions against the child shop P/N E/C, and the child P/N E/C follows and reacts to the transactions that occur against the parent P/N E/C; the child P/N E/C must be effective to the part that the parent P/N E/C is complied with. The child P/N E/C can also be track independently from its parent P/N E/C. Each control can be used to build different types of parent/child relationships between 2 P/N E/Cs. When the New
Note: It is important to understand how the Schedule Control and Schedule Control By tabs work based on the control selected. The control and tab used to create the relationship determines if the E/C entered will be the parent E/C or the child E/C to the currently selected E/C.
The following information/options are available in this window: Control Under the Schedule Control tab, when the following controls are used the E/C entered will behave as a parent E/C to the currently selected E/C: Called On - The Called On control allows users to specify at which parent E/C frequency a child E/C is to be called on and complied with. The Called On control works in conjunction with the Total Frequency field of the parent E/C's Schedule tab.For additional information, refer to Called On, via Engineering Control Schedule Control Tab via the eMRO Engineering - E/C Training Manual. Called On 1st - The Called On 1st and Called On Repeat controls are meant to be used together, where an E/C is activated by one E/C (Called On 1st) and then repeated on another E/C (Called On Repeat). For additional information, refer to Called On 1st, via Engineering Control Schedule Control Tab via the Engineering - E/C Training Manual. Called On At - The Called On At control is used to specify when a child E/C will start a called on relationship to its parent E/C, and at what interval the child E/C will be called on afterwards. For additional information, refer to Called On At, via Engineering Control Schedule Control Tab via the Engineering - E/C Training Manual. Called On Repeat - The Called On Repeat and Called On 1st controls are meant to be used together, where an E/C is activated by one E/C (Called On 1st) and then repeated on another E/C (Called On Repeat). For additional information, refer to Called On Repeat, via Engineering Control Schedule Control Tab via the Engineering - E/C Training Manual. Terminate E/C If Terminated - The Terminate E/C If Terminated control allows users to set up multiple parent/child relationships where multiple parent E/Cs need to be terminated before terminating the child E/C. For additional information, refer to Terminated E/C If Terminated, via Engineering Control Schedule Control Tab via the Engineering - E/C Training Manual.
Under the Schedule Control tab, when the following controls are used the E/C entered will behave as a child E/C to the currently selected E/C: E/C To Be Activated - The E/C To Be Activated control is used where upon compliance to the parent E/C the child E/C is activated. For additional information, refer to E/C To Be Activated, via Engineering Control Schedule Control Tab via the Engineering - E/C Training Manual. E/C To Be Complied With - The E/C To Be Complied With control is used where upon compliance to the parent E/C the child E/C also receives a compliance record. For additional information, refer to E/C To Be Complied With, via Engineering Control, Schedule Control Tab via the Engineering - E/C Training Manual. E/C To Be Terminated - The Terminate E/C If Terminated control allows users to set up multiple parent/child relationships where multiple parent E/Cs need to be terminated before terminating the child E/C. For additional information, refer to E/C To Be Terminated, via Engineering Control Schedule Control Tab via the Engineering - E/C Training Manual. Note: When the status of the E/C is Open, or Applicable/ Not Embody, and compliance is manually written, the functionality of termination will still occur. Called On Displays the child E/Cs called onto the parent E/C entered in the E/C field. Lower Level checkbox When this checkbox is selected it indicates that all of the task card steps for the child E/C are contained within the parent E/Cs task card. When the parent E/C is added to a work order, the child E/C follows but any task cards related to the child E/C will not be attached to the work order.
Note: When Switch Ovr checkbox (Override checkbox)
Frequency The frequency number indicates the interval the child E/C is to be called on to the parent E/C. For example, if the frequency number is 2, every second time the parent E/C is added to a work order the child E/C will follow. _____________________________________________________________________________________
Additional Information: The system will prevent users from creating a loop between 2 E/Cs. For example, parent E/C 'ECSHOP-32-25-01' calls on child E/C 'ECSHOP-32-25-02'. If the user tries to create a called on relationship where E/C 'ECSHOP-32-25-02' is the parent to E/C 'ECSHOP-32-25-01', a hard warning appears.
|
||||||
Top of Page |
Publication Date: 11/12/2024
![]() ![]() ![]() ![]() |
|||||