Publication Date: 11/12/2024 Share Print

Previous Topic

Next Topic

Book Contents

Book Index

Engineering Control Shop, P/N Effectivity Control Tab

The P/N Effectivity Control Tab allows the user to apply or remove A/C Effectivity as setup in the currently selected E/C to a specified P/N. The P/N is made effective to the A/C or effectivity is removed from the A/C once the compliance record for the E/C is written. The compliance record is written for this E/C once the Work Order is closed.

Note: The functionality found in this tab is intended for Aircraft Engineering Controls.

eMRO-Engineering Control Shop, PN Effectivity Control Tab

Note: The user has the option to enter as many Part Numbers as desired by clicking on the New button. Additionally, the user also has the option to remove P/Ns by utilizing the Delete button.

A/C effectivity can be applied to a P/N via E/C Compliance even if there is an Interchangeable relationship set up.

See Also

Engineering Control Shop Detail

Engineering Control Shop Detail, General Tab

Engineering Control Shop Detail, Schedule Tab

Engineering Control Shop Detail, Schedule Control Tab

Engineering Control Shop Detail, Other Tab

Engineering Control Shop Detail, E/C Content Tab

Engineering Control Shop Detail, Optional Tab

Engineering Control Shop Detail, Software Tab

Engineering Control Shop Detail, Warranty Tab

Engineering Control Shop Detail, Affected Manuals Tab

Engineering Control Shop Detail, Schedule Controlled By Tab

Engineering Control Shop Detail, Authorization History Tab

Engineering Control Shop Detail, Location/Site Ban Control Tab

Engineering Control Shop Detail, Restrictions Tab

Engineering Control Shop Detail, Informational Tab

Engineering Control Shop Detail, Revision History Tab

Engineering Control Shop Detail, Vendor Restriction Tab

Engineering Control Detail Shop Buttons

Top of Page Publication Date: 11/12/2024 Share Print