Publication Date: 11/12/2024 Share Print

Previous Topic

Next Topic

Book Contents

Book Index

Engineering Control Shop Detail

The Engineering Control Shop (E/C) option allows users to configure the controls and requirements associated with parts within the system. Additional controls are used along with the basic E/C configuration, which are described later.

E/Cs are effective to components (parts). Airworthiness Directive (AD) and Service Bulletin (SB) status can be tracked for aircraft by using E/Cs. Component related P/N E/Cs can be tracked with the additional capability to specify hard time limitations. These items can then appear in Planning Control for scheduling.

Task Card requirements can be linked to the E/C. The Task Cards are then added to the Shop Orders (along with the E/C) in the Shop Module or via the Planning Control application.

When the Task Cards are completed under the Shop Work Order, this then allows the E/C status to be updated (when the Shop Work Order is closed). Compliance records are also written.

The critical items for the control of the E/C are the schedule and the effectivity. There are numerous combinations of ways to configure E/Cs and relative information. Please consider additional support regarding this matter if necessary.

The E/Cs may require authorization. One step authorization or complex authorization processes may be set up. Please refer to the E/C Authorization section for additional information.

The following tabs and buttons are available:

Engineering Control Shop Detail Tabs

Engineering Control Shop Detail Buttons

General Tab

Schedule Tab

Schedule Control Tab

Other Tab

E/C Content Tab

Optional Tab

Software Tab

P/N Effectivity Control Tab

Warranty Tab

Affected Manuals Tab

Schedule Controlled By Tab

Authorization History Tab

Location/Site Ban Control Tab

Restrictions Tab

Informational Tab

Revision History Tab

Vendor Restriction Tab

New button

Save button

Delete button

eMRO_but_Note_Main Notes button

Print button

Find button

but_compliance_sm Compliance button

Sub Functions

but_document_small Document button

P/N CTL button

but_task_card_control_small Task Card Control button

Task Card button

but_revision control (small) Revision Control button

Attachment button

but_renamecopy_sm E/C Rename/Copy button

but_change ec revision (small) Change E/C Revision button

but_MPD_small MPD button

Records can be created/opened from the Engineering Control Shop.

In This Section

Engineering Control Shop Detail, General Tab

Engineering Control Shop Detail, Schedule Tab

Engineering Control Shop Detail, Schedule Control Tab

Engineering Control Shop Detail, Other Tab

Engineering Control Shop Detail, E/C Content Tab

Engineering Control Shop Detail, Optional Tab

Engineering Control Shop Detail, Software Tab

Engineering Control Shop, P/N Effectivity Control Tab

Engineering Control Shop Detail, Warranty Tab

Engineering Control Shop Detail, Affected Manuals Tab

Engineering Control Shop Detail, Schedule Controlled By Tab

Engineering Control Shop Detail, Authorization History Tab

Engineering Control Shop Detail, Location/Site Ban Control Tab

Engineering Control Shop Detail, Restrictions Tab

Engineering Control Shop Detail, Informational Tab

Engineering Control Shop Detail, Revision History Tab

Engineering Control Shop Detail, Vendor Restriction Tab

Engineering Control Detail Shop Buttons

See Also

Engineering Control Shop

Engineering Control Shop, General Tab

Engineering Control Shop, Other Tab

Top of Page Publication Date: 11/12/2024 Share Print