Publication Date: 11/12/2024
![]() ![]() ![]() ![]() |
||||||
The Revision Control Go to Engineering/Update/Engineering Control Shop, select the E/C that must be revised. Note: Remember that the Engineering Authorization configuration Switch From the Engineering Control Shop window, select the Revision Control The system displays the Revision Control Window. Update the Revision and select the Save
The following information/options are available in this window: Originating Reference Original Engineering Control reference that requires revision. Revision The revision number of the E/C. This can be alpha numeric. When the revision is changed and saved, the system will prompt the user with a revision control record, where the changes made for the specific revision can be saved for auditing purposes. The 'Revised By' field will be automatically updated with the user's user code, and the revision date can be set as required. Revision By The user who creates and/or authorizes the E/C revision. Revision Date The date of the new revision takes effect. Description The description/reason of the new revision. Send For Authorization checkbox Check to send the record directly to its Authorization Explorer queue awaiting authorization (with a status of 'Pending'). If unchecked, the record must be released for authorization via the Authorization Management option. Revise Linked Task Cards If this box is checked, any Task Card that is attached to the E/C will also be revised. This is helpful when a revision for both the E/C and the Task Card were issued since the revisions can be done in one step. Enter the new Revision number, and select to send the Task Card to authorization right away. Note that both the E/C and the Task Card, need to be authorized individually. Refer to the manual for more information about the Authorization process. The Task Card can be attached to the E/C by selecting the Task Card Control Note: When an E/C is currently under revision, that E/C will indicate as such (via a Red alert flag) on the General Tab of the Engineering Control Update window. New Task Card Revision The new Task Card Revision identification. Note: This window appears when the Revised Link Task Card is selected. Task Card Send To Authorization checkbox Select this checkbox to send link Task Card(s) for authorization. Go To Revision Window checkbox The user must have proper security access to the Authorization Management option in order to use this checkbox. If the user selects the Go To Revision Window checkbox, the user will be presented with the Authorization window after saving. The information from the record that is being revised will appear on the window for editing, if required. Apply Revision to ALL E/Cs that meet the Sub of [ ] and Control of [ ] checkbox If selected, all E/Cs containing the same Sub E/C and Control of the E/C in use will be placed into the same revision. _____________________________________________________________________________________ The Save prompt appears. Select 'OK.' Once the Save Note: When an E/C has an open, pending authorization revision, users cannot create or save another revision. A warning prompt displays. If an E/C already contains an open revision, close the pending revision before issuing another one. |
||||||
Top of Page |
Publication Date: 11/12/2024
![]() ![]() ![]() ![]() |
|||||