Publication Date: 11/12/2024 Share Print

Previous Topic

Next Topic

Book Contents

Book Index

Engineering Request Button, via Defect Report Detail

The Engineering Requests button emro_but_engineering_request_review_via_defect_report is used to request an engineering technician to revise or make recommendations regarding a Defect Report. Once an Engineering Request is created, it's displayed in the Engineering module for the engineering department to review. After review, the engineering department can either reject the request or update the request with a rectification reason. System notification can be set up throughout the process which will notify users when an Engineering Request has been created or resolved.

eMRO_V5_gold Note: In eMRO version 5, Engineering Request Review has replaced the terminology Task Card Discrepancy.

Select the Engineering Request emro_but_engineering_request_review_via_defect_report button and the W/O Task Card/Defect Engineering Request window appears. Enter the required details for the request.

ERR_General Tab - via Defect Report(1)

 

The following information/options are available in this window:
_____________________________________________________________________________________

A/C

The individual aircraft tail number.

Defect Type/Defect/Item

The type of defect found (e.g. Pilot, Maint); the defect or logbook reference number; the defect or logbook item number. This is the Defect Report that the Engineering Request is being reported on.

Location

The location where the Engineering Request was created.

Description

The description of the defect which describes the problem found or notes the service being performed.

Status

The status of the Engineering Request discrepancy (Open, Under Review, Reviewed, Rejected, Closed).

Assigned To

The person that the discrepancy is assigned to.

Date Assigned

The date when the discrepancy was assigned to the user.

Category

The discrepancy category as entered by the reporting user.

Due Date

The date/time the Engineering Request needs to be actioned by.

Close Date

The date when the discrepancy is closed. This field is only available when the discrepancy is in 'Reviewed' Status.

Reason

The reason as to why the discrepancy is being reported.

_____________________________________________________________________________________

Engineering Request Review Process

Additional information can be viewed and entered through the following:

In This Section

W/O Task Card/Defect Engineering Request, Informational Tab

W/O Task Card/Defect Engineering Request, User(s) Notification Setup Tab

Notes Button, via W/O Task Card/Defect Engineering Request

See Also

Defect Report Detail Buttons

New Item Button, via Defect Report Detail

Notes Button, via Defect Report Detail

Attachment Button, via Defect Report Detail

P/N Install/Remove Button, via Defect Report Detail

W/O Button, via Defect Report Detail

Requisition Button, via Defect Report Detail

Picklist Button, via Defect Report Detail

Service Order Button, via Defect Report Detail

Defect Template Button, via Defect Report Detail

Audit Button, via Defect Report Detail

Change Defect Key Button, via Defect Report Detail

SDR Creation Button, via Defect Report Detail

Intelli Form Button, via Defect Report Detail

eMRO Forms Button, via Defect Report Detail Buttons

P/N Install/Remove Query Button, via Defect Report Detail

Copy Button, via Defect Report Detail

eMRO Auto R/I Button, via Defect Report Detail

Top of Page Publication Date: 11/12/2024 Share Print