Planning Control 7.3

Planning Control

7.3

Parent E/C Button, via Due List Window

 

The Parent E/C button allows the user to view the Parent E/C of the E/C associated with the selected planning item.

 

Interactive Planner Window

7.3

Overdue Icon - The following functionality has been added:

Note: Non-Schedule E/Cs will not be taking into consideration when calculating overdue flight records.

7.3

Display Schedule Flights checkbox - Select the Display Schedule Flights checkbox to show scheduled flights for each aircraft.

7.3

Display Packaged Tasks checkbox - Select the Display Packaged Tasks checkbox to show tasks (e.g., Defects and Engineering Controls) assigned to a Work Order.

7.3

Display Unpackaged Tasks checkbox - Select the Display Unpackaged Tasks checkbox to show tasks (e.g., Defects, Controls, and Engineering Controls) that are not assigned to a Work Order.

7.3

Defect plan-Defects icon Icon - Indicates that there is a Defect associated with the A/C. Hover over the Defect icon to view the Defect, Description, and W/O. This icon is visible when the Display Packaged Tasks and/or the Display Unpackaged Tasks checkboxes are selected. Select the Defect plan-Defects icon icon to view the Defect Detail window.

7.3

E/C plan-EC icon Icon - Indicates that there is a Engineering Control associated with the A/C. Hover over the E/C icon to view the E/C, P/N, S/N, and Description. This icon is visible when the Display Packaged Tasks and/or the Display Unpackaged Tasks checkboxes are selected. Select the E/C plan-EC icon icon to view the E/C Detail window.

7.3

Control plan-Control icon Icon - Indicates that there is a Control associated with the A/C. Hover over the Control icon to view the Control, P/N, S/N, and Description. This icon is only available when the Display Unpackaged Tasks checkbox is selected.

 

Inventory Planner Window

7.3

A/C - The following functionality has been added:

Note: When a Requisition is created for a Defect, the linked A/C will appear in this field.

7.3

P/N Required (From / To) - Select the From button to choose the Part Number Requirement(s) associated to the records being queried. When the selection window opens, filters can be used to search for P/N Requirements using the corresponding field and/or descriptions. Multiple P/N Requirements can be chosen.

 

Switches

7.3

WOTCSCHDOVERWRITE - When set to Yes and a Work Order's Work Package Schedule is changed, the system will overwrite the Schedule Start/End Date of the existing W/O Task Card(s) with the Work Order's Schedule Start/End Date. When set to No and a Work Order's Work Package Schedule is changed, the system will not overwrite the Schedule Start/End Date of the existing W/O Task Card(s) with the Work Order's Schedule Start/End Date. For more information, refer to WOTCSCHDOVERWRITE in the Planning Training Manual.

Topic updated: 9/9/2024 4:00:04 PM

See Also

eMRO 7.3

Engineering 7.3

Inventory 7.3

G/L Interface 7.3

Library 7.3

Link 7.3

Orders 7.3

Receiving 7.3

Requisition 7.3

Settings 7.3

Shop 7.3

System Administration 7.3

System Standards 7.3

Technical Records 7.3

TraxDoc 7.3