Receiving 7.3

Receiving Module

 

Control - E/C Button, via Receiving Inspection Detail

7.3

Note: If Switch INSPOVRENG is set to Yes, the system will override overdue controls and will not display the associated overdue hard warning. For more information, refer to INSPOVRENG, via Receiving Switches.

7.3

Note: The R/I window will automatically update to reflect any changes made to the engineering control's status while the order is in transit.

7.3

Reset Date - The following functionality has been added to this field:

Note: Users can save this window without populating the Reset Date field.

7.3

Schedule Date - The following functionality has been added to this field:

Note: Users can freely edit the information in this field.

7.3

Status drop down - The following functionality has been added to this field:

Note: The status drop down will appear regardless if the complied checkbox is selected and will auto-populate with a status corresponding to the information entered in the Engineering Effectivity Override window. Additionally, only selected controls with an Open status will have compliance performed against them.

Receiving Switches

7.3

INSPOVRENG - When set to Yes, the system will override overdue controls and will not display the associated overdue hard warning. When set to No, overdue controls will display a hard warning and block the receiving process.

Topic updated: 10/23/2024 9:31:11 AM

See Also

eMRO 7.3

Engineering 7.3

Inventory 7.3

G/L Interface 7.3

Library 7.3

Link 7.3

Orders 7.3

Planning Control 7.3

Requisition 7.3

Settings 7.3

Shop 7.3

System Administration 7.3

System Standards 7.3

Technical Records 7.3

TraxDoc 7.3

Top of Page Publication Date: 11/12/2024 Share Print