Publication Date: 11/12/2024
![]() ![]() ![]() ![]() |
|||||||||||
Shop W/O Reservation ControlFollowing creation of the Shop Work Order, any materials or labor that is required for the work can be automatically reserved. The system can generate Picklists for parts and labor that are required to complete the Shop Work Order. Picklists will be generated only for the parts on Task Cards that are on that Shop Work Order. The Picklists will then be issued to the Shop Work Order and then associated costs allocated to that work. The following steps are involved in the Shop Work Order Reservation Control process.
The “Back Order Create Flag” will select if the System will create Requisitions for below level P/N's when reserving material for the Shop Work Order. If this is not switched on, the system will only print a list of the “Shortage Items” and the user will then be responsible for ensuring that any parts required are ordered or made available. A queried Shop Work Order can be accessed through the Select The following tabs and buttons are available.
|
|||||||||||
Top of Page |
Publication Date: 11/12/2024
![]() ![]() ![]() ![]() |
||||||||||