Publication Date: 11/12/2024 Share Print

Previous Topic

Next Topic

Book Contents

Book Index

Print Button, via Concession Registry Detail

Select the Print button to activate the print functionality that will generate a report or print of the current screen. Many of the prints that are generated are customized per user request. For more information, refer to the appropriate administrator.

From the print report that is generated, the user has the option to print the report that is being viewed through the Print button, or use the E-mail button to produce a PDF of the report that can be emailed.

See Also

Concession Registry Detail Buttons

Notes Button, via Concession Registry Detail

Attachment Button, via Concession Registry Detail

Update Concession Button, via Concession Registry Detail

Audit Button, via Concession Registry Detail

Planning Button, via Concession Registry Detail

One Time Rectification Interval Extension Notification Form Button, via Concession Registry Detail

Planning Button, via Concession Registry Detail

logo_V7_Big

Selecting the Planning button Prompts the Planning Query window. This window details the Control, Actual, and Initial Schedules and Planning Information of the associated record. Planning Information displayed in this window is also reflected in Planning Control. For more information, refer to the Planning Control module.

EC Planning Query

The following information/options are available in this window:
_____________________________________________________________________________________

A/C

The individual aircraft tail number.

E/C

The Engineering Control that specifies aircraft or component scheduled maintenance intervals.

P/N

The Part Number reference for the aircraft part.

P/N S/N

The Serial Number of the Part Number associated with the record.

Position

The related A/C position.

Due Date

The date that the maintenance item was due.

REV Due Date

The date that the revision is due.

W/O

The Work Order used to categorize, manage, and schedule work requirements for aircraft maintenance.

Internal Checkbox

The Internal checkbox is used to determine if work can be done internally. The Internal Capability checkbox will be set to 'On' by default only for those items that a company has the capability to perform internally. The checkbox can be set up through Defect Reports/General Tab, E/C/Other Tab, and P/N Master/P/N Control button.

Description

A free-text description of the item.

Control Schedule Hours/Cycles/Day

The entered Hours/Cycles/Day Schedule of the associated Control E/C.

Control Schedule Date

The entered Scheduled Date of the associated Control E/C.

Initial Schedule Hours/Cycles/Day

The initial Hours/Cycles/Day schedule entered against the E/C record.

A/C Schedule Hours/Cycles/Day

The actual Hours/Cycles/Day scheduled against the E/C record.

Earliest checkbox logo_V7_small

The Earliest checkbox option is selected if the E/C Schedule parameters are to be planned at the earliest occurrence. By selecting the Earliest checkbox, the schedule will be determined by which occurrence comes first: the Hours, Cycles, Days, or Date. For the latest occurrence, this checkbox should not be selected. This same logic is used independently by the parameters of the Effective Date-based Schedule (left) and of the Total Schedule (right).

Whichever Occurs drop down logo_V7_small

This dropdown field selection allows users to control which schedule option will be used between both the Effective Date-based Schedule (left) and the Total Schedule (right). Select the 'Earliest' dropdown option to have the system default to the schedule that reaches the earliest occurrence between the Hours/Cycles/Days/Date parameters (left) or the Total Hours/Total Cycles/Total Days parameters (right). Select the 'Latest' option to default to the schedule that reaches the latest occurrence between the two schedule types.

Remaining Time/Cycles/Day

The amount of Time/Cycles/Days remaining on the E/C's entered schedule(s).

logo_V7_small Note: In version 7.3 and onward, these fields have been renamed to "CTL Remain Hours/Cycles/Days".

Initial Remaining Hours/Cycles/Days logo_V7_small

The remaining initial hours/cycles/days of the E/C's schedule.

A/C Remaining Hours/Cycles/Days logo_V7_small

The actual remaining hours/cycles/days of the E/C's schedule.

_____________________________________________________________________________________

The Export as Excel button can be selected to view the queried data (including all pages) in an Excel spreadsheet. This Excel file can be saved for later use. For more information refer to the Export as Excel Button via the eMRO System Standards manual.

The Filter/Sort filter sort button button is used to alter the search criteria for records associated with the host module and window. For more information, refer to Filter/Sort Button via the eMRO System Standards Module.

Top of Page Publication Date: 11/12/2024 Share Print