Publication Date: 11/12/2024 Share Print

Previous Topic

Next Topic

Book Contents

Book Index

GSE Planning

The GSE Planning window is used to generate a query of all GSE types, associated schedules, and other relevant information.

Populate the filter fields and select the Find button to generate a query.

eMRO_GSEPlanning(1)

 

Planning Elements:

The following information/options are available in this window:
_____________________________________________________________________________________

Query Selection

Formats included in the drop list are 1 - 5 Years and Detail. Choosing any of the formats will narrow the search results accordingly. Depending on which format is selected, the appropriate Planning Elements will become available for your selection. Check any of the following Planning Elements are selected by checking the appropriate checkboxes:

E/C checkbox - Select this checkbox to filter for E/Cs that have effectivity to aircraft (Mods, SB's, ADs etc).

Note: If this checkbox is selected, the following fields are available:

E/C No Schedule checkbox - Select this checkbox to filter for E/Cs that do not have a Schedule.

Note: If this checkbox is selected, the following fields are available:

P/N E/C checkbox - Select this checkbox to filter for E/Cs that have effectivity to Part Numbers (SBs, etc).

Note: If this checkbox is selected, the following fields are available:

P/N E/C No Schedule checkbox - Select this checkbox to filter for E/Cs (that do not have a schedule) that have effectivity to Part Numbers (SB's etc).

Note: If this checkbox is selected, the following fields are available:

W/O checkbox - Select this checkbox to filter by Work Order.

Next E/C checkbox - Select this checkbox to filter for E/Cs that appear in the Next E/C field via Engineering/ Update/ E/C/ Schedule Tab and all associated E/Cs.

P/N Control checkbox - Select this checkbox to filter by P/N Control.

Note: If this checkbox is selected, the following fields are available:

GSE (From-To)

The GSE to show Planning information (From/To).

GSE Type/Series

The GSE Type/Series to show Planning information (From/To).

E/C Control

The E/C range to show Planning information (From/To).

E/C Category

The category of the E/C (e.g., AD, SB, CHECK).

Planner

The user assigned as Planner for the GSE. User is defined in Settings/ Update/ GSE/ Optional 2 Tab.

Capability Area

Narrows records to appropriate Capability Area. The choices are Line, Heavy Maintenance, or All. Capability Areas are defined uniquely for Defects, E/Cs, and P/N Controls.

Due Date

Select to show all items due prior to the date chosen.

Within Hours

Select the number of aircraft hours to search within, for items due. You can select additional parameters, such as 'within hours', which will show you items that are due within the flight hours specified. One point to note is that if you wish to cancel some parameters (i.e. delete them) then it is better to exit from the option and re-run it. This will ensure that there are not any 'false' selections in the query.

Spare Forecast

If checked, a P/N Light will appear next to all items in the GSE Planning Query results if they require parts from inventory in order to be accomplished. The P/N Light will appear in any of three colors to indicate the current availability of the part. If unchecked, the P/N Lights will not appear.

Over Night Station

Over Night Station Code.

Location

The location of the GSE.

_____________________________________________________________________________________

The Export as Excel button can be selected to view the queried data (including all pages) in an Excel spreadsheet. This Excel file can be saved for later use. For more information refer to the Export as Excel Button via the eMRO System Standards manual.

The Filter/Sort filter sort button button is used to alter the search criteria for records associated with the host module and window. For more information, refer to Filter/Sort Button via the eMRO System Standards Module.

P/N Lights - Displays the status of available parts for the due item.

Green Light - Green will display if all parts required are available in inventory.

Yellow Light -Yellow will display if some but not all parts are available in inventory.

Red Light - Red will display if no parts are available in inventory.

Once you have entered the parameters to be queried in the GSE Planning Query option, select the Find button.

The GSE Planning Query Results will appear as shown below.

In This Section

Print Button, via GSE Planning

P/N Button, via GSE Planning

Cost Button, via GSE Planning

WO Auto - New Button, via GSE Planning

WO Auto - Exist Button, via GSE Planning

See Also

GSE, Query Menu

GSE Engineering Control Query

GSE Master Query

GSE P/N Master Query

GSE Type/Series Query

GSE W/O Query

Top of Page Publication Date: 11/12/2024 Share Print