Called On Repeat, via Engineering Control, Schedule Controlled By Tab

The Called On Repeat and Called On 1st controls are meant to be used together, where an E/C is activated by one E/C (Called On 1st) and then repeated on another E/C (Called On Repeat).

The E/C must have a Called On 1st control before the system allows the user to create a Called On Repeat control. Once the child E/C is complied with via the compliance of the Called On 1st parent E/C, it will start its relationship with the Called On Repeat parent E/C. For more information on the Called On 1st control, refer to Called On 1st, via Engineering Control Schedule Control By Tab.

Called On Repeat, Engineering Control, Schedule Controlled By

Note: The child E/C above also has a Called On 1st parent/child relationship set up, but since it is under another parent E/C it will not appear in the Schedule Control By tab. The user can see the the Called On 1st and Called On Repeat controls under the Schedule Control tab of the child E/C.

Note: If the Called On Repeat parent E/C is complied with before the Called On 1st parent E/C, the child E/C will not receive a compliance record; the Called On 1st parent E/C must be performed for the child E/C to receive initial compliance to trigger its relationship with the Called On Repeat parent E/C.

Note: This control can only be utilized once per E/C.

 

The following information/options are available in this window:
_____________________________________________________________________________________

Freq (Frequency)

The frequency number indicates the interval the child E/C is to be called on to the parent E/C. For example, if the frequency number is 2, every second time the parent E/C is added to a work order the child E/C will follow.

Note: If the Freq field is set to '000', the Called On E/C will follow at every occurrence of the parent E/C.

Start At

The Start At number indicates at which parent E/C compliance (Completed NO) the child E/C should be called on to receive compliance.

If the Called On Repeat parent E/C gets complied with before the Called On 1st parent E/C, and the Called On Repeat parent E/Cs Completed No. now surpasses the Start At number, when the Called On 1st parent E/C eventually gets complied with to trigger and activate the Called On Repeat relationship, the child E/C will ignore that the Called On Repeat Start At number and be called on the parent E/C at the next applicable frequency.

E/C Called On Schedule Exceptions but_ec_called_on_schedule_exceptions_small button

Indicates that there are differences between the child E/C and parent E/C schedules. When the button is selected the system displays the E/C Called On Schedule Exceptions popup window displaying the fields where the schedule values are different.

_____________________________________________________________________________________

 

If the user attempts to create a Called On Repeat control before a Called On 1st control has been entered the following warning will appear:

 

Called On 1st / Called On Repeat Example:

Using the above parent/child E/C relationships, the child E/C should initially be called on to the Called On 1st parent E/C at its 4th compliance (Start At = 4). The Called On 1st compliance triggers the child E/C to start its relationship with the Called On Repeat control where the child E/C is called on onto the Called On Repeat parent E/C at its 3rd compliance (Start At = 3), and then repeat every second occurrence afterwards (Freq = 2).

The Called On 1st parent E/C has received compliance 3 times for A/C 901.

The child E/C has not yet been complied with for A/C 901.

Upon the Called On 1st parent E/C's 4th compliance the child E/C is called on.

The parent E/C receives its 4th compliance for A/C 901.

And the child E/C, called onto the parent E/C's 4th compliance, has also been complied with for A/C 901.

The child E/C's compliance (driven by the compliance of the Called On 1st parent E/C) triggers the called on relationship with the Called On Repeat parent E/C for A/C 901.

Using the parent/child E/C relationship above for the Called On Repeat control, the parent E/C has a Start At = 3 and Freq = 2. The Called On Repeat parent E/C will receive compliance 2 times and then upon its 3rd compliance the child E/C will be called on; the child E/C will then continue to be called on the Called On Repeat parent E/C every second occurrence.

The Called On Repeat parent E/C is complied with 2 times on A/C 901.

Upon the Called On Repeat parent E/C's 3rd compliance the child E/C is called on.

The Called On Repeat parent E/C receives its 3rd compliance for A/C 901.

And the child E/C, called onto the parent E/C's 3rd compliance, has also been complied with for A/C 901.

When the parent E/C is complied with the 4th time for A/C 901, notice the child E/C will not be called on.

When the parent E/C is complied with the 5th time for A/C 901, notice the child E/C is called on.

And the child E/C receives its 3rd compliance for A/C 901.

The child E/C will continue to be called on every second occurrence of the parent E/C.

See Also

Engineering Control, Schedule Controlled By Tab

Called On, via Engineering Control, Schedule Controlled By Tab

Called On 1st, via Engineering Control, Schedule Controlled By Tab

Called On At, via Engineering Control, Schedule Controlled By Tab

E/C To Be Activated, via Engineering Control, Schedule Controlled By Tab

E/C To Be Terminated, via Engineering Control, Schedule Controlled By Tab

Terminated E/C If Terminated, via Engineering Control, Schedule Controlled By Tab

E/C To Be Complied With, via Engineering Control, Schedule Control By Tab

Top of Page Publication Date: 11/12/2024 Share Print