Publication Date: 11/12/2024 Share Print

Previous Topic

Next Topic

Book Contents

Book Index

P/N Category Change Button, via GSE P/N Master

The P/N Category Change but_pn_category_change_small button allows for the change of any GSE P/N’s category as required. The new P/N Category that is being assigned must have GSE parts currently associated before a P/N Category Change can occur. When a GSE P/N Change is attempted, the system will check for open; Loan, Exchange, Repair, and Transfer Orders before allowing the GSE P/N category change. Positions and Time Controls against the current part must also be removed before changing the P/N Category.

Go to GSE/ Update/ GSE P/N Master. Select the GSE P/N you want to change the category for.

From the Interchangeable multi but_interchangeable_small button, click the P/N Category Change but_pn_category_change_small button. Click into the To Category field. The Drop Down Selection appears as shown below. Select a part type by clicking on selection and click on the Find button.

 

The following information/options are available in this window:
_____________________________________________________________________________________

From Category

The current category of the part.

To Category

The new category for the part.

S/N

The Serial Number for the specific serialized part.

_____________________________________________________________________________________

A list of P/Ns appear for the selected part type.

The user can manually enter a S/N, or click on the Auto Serial Number Assign but_auto_serial_number_assign_small button to have the system automatically create and assign serial numbers to all parts in the list.

For more information on the Auto Serial Number Assign but_auto_serial_number_assign_small button, please refer to the topic Auto Serial Number Assign Button.

Note: When a P/N is changed to serialized, a new Goods Received Batch number (GRB) is assigned to the part in inventory. As a result, the history of the of the part will be lost, but it could be referenced in the Inventory Transaction History Query window using the old GRB number.

Note: The P/N Category Change will only add a Journal Entry for the upgrade/downgrade from Rotable (Serialized) to Expendable (Consumable) and vice versa. There is not a J/E association from Expendable to Expendable, Rotable to Rotable, or Repairable to Repairable since they are of the same P/N Transaction Category. For more information, refer to the P/N Category System Transaction Code.

 

Warnings:

If the P/N order has not been received before attempting to change the P/N Category, the following error will appear:

If a P/N Control already exists, the following error will appear:

If the P/N position already exists, the following error will appear:

If the GSE P/N exists in the GSE P/N Master, but is not present in Inventory, the following soft warning will appear:

See Also

GSE P/N Master Buttons

Notes Button, via GSE P/N Master

Audit Button, via GSE P/N Master

Control Button, via GSE P/N Master

Effectivity Button, via GSE P/N Master

Positions Button, via GSE P/N Master

Attachment Button, via GSE P/N Master

Top of Page Publication Date: 11/12/2024 Share Print