Publication Date: 11/12/2024 Share Print

Previous Topic

Next Topic

Book Contents

Book Index

Engineering Authorization Management

The Engineering Authorization Management option allows users to view and modify the E/C (if required) and release the E/C so that it can be sent to the E/C Authorization Queue (Engineering/Explorer/Engineering Authorization). Please refer to the Engineering Control Authorization section for additional information regarding the Engineering Authorization Explorer.

For the Engineering Authorization process to be utilized, the ECAUTH (Engineering Authorization) configuration switch must be set to Yes. When set to Yes, all E/Cs will require Authorization. If an Authorized E/C is copied, the copy will go by default to the Engineering Authorization Management queue to be Released To Authorization. When the switch is set to No, upon creating an E/C, it will automatically be Authorized, but the status of that E/C must be manually changed to Open and any copy thereafter will be in 'Open' status. For more information, refer to Switch ECAUTH via the Engineering Switches Manual.

Once an E/C has been created and that E/C is pending Authorization, the E/C will appear in the Engineering Authorization Management queue awaiting modification and then release to Authorization. Many of the buttons that appear with the E/C while it awaits Release are the same as when the E/C was created. Please refer to the Engineering Control buttons section for additional information regarding the functionality of those buttons, if required. The buttons that are unique to the Engineering Authorization Management option are described in this section.

This update window is also available in query mode where users can view the records provided in this window but cannot create new records or edit existing data. Refer to this module's Query menu.

The following tabs and buttons are available:

E/C Authorization Management Tabs

E/C Authorization Management Buttons

General Tab

Other Tab

import button ean Import button logo_V7_small

eMRO_but_Note_Main Notes button

Find button

Select button

but_mass authorize pending ECs Mass Authorize Pending ECs button

but_ec analyzer E/C Analyzer button logo_V7_small

After utilizing the Task Card Authorization Management window as needed, the user can proceed with the Engineering Authorization Management Detail.

For more information detailing the functionality of the process, refer to the following:

Authorization Process

In This Section

Engineering Authorization Management, General Tab

Engineering Authorization Management, Other Tab

Import Button, via Engineering Authorization Management

Notes Button, via Engineering Authorization Management

Mass Authorize Pending E/Cs Button, via Engineering Authorization Management

E/C Analyzer Button, via Engineering Authorization Management

Authorizing the E/C via Engineering Authorization Explorer

Engineering Authorization Process

See Also

Engineering E/C, Update Menu

Engineering Compliance

Engineering Control Selection

Engineering Control Shop

Engineering Control Supervisor

Top of Page Publication Date: 11/12/2024 Share Print