Publication Date: 11/12/2024 Share Print

Previous Topic

Next Topic

Book Contents

Book Index

Engineering Order Button, via Repair Order Detail

Select the Engineering Order button to view defined Engineering Control & P/N Control information for the Part Number associated with the Repair Order Order.

This will only allow the user to query the Part Number Engineering Control & P/N Control information.

eMRO_V5_gold Note: In eMRO version 5 and later releases the Control button, P/N E/C button, and Repair Order Control tab have been replaced by the Control - E/C button.

 

The following information/options are available in this window:
_____________________________________________________________________________________

Control

The time control related to the part (e.g., TSN, TSO, etc.) used to define its limits.

A/C

The individual aircraft tail number.

A/C Position

The Position for the Time Control (if applicable). All P/N Control schedules are action based. In other words, P/N Schedules will not change seamlessly just because schedule criteria is met. There must be some transaction to generate the change in the P/N Control Schedule. Examples of such actions are when a P/N is received, an A/C Position is changed, an N/L/A Installation is changed, or when there is an A/C Installation to trigger the schedule change against the part.

NHA P/N

The part’s Next Higher Assembly P/N (if applicable).

Schedule Hours/Cycles/Days

The control's hours/cycles/days schedule, as applicable.

Task Card

The Task Card / Job Card that details the scheduled maintenance work.

Description

The description of the Task Card.

Status (T/C)

The current status of the Task Card. The status of the Task Card is helpful in determining the stage the Task Card is at with regard to it's completion. Ultimately, the completion of the Task Cards will result in the closing of the Work Order.

QTY

The quantity of parts currently on the Task Card.

E/C

The Engineering Control that specifies aircraft or component scheduled maintenance intervals.

Status (E/C)

The current status of the Engineering Control.

Schedule Date

The current schedule of the E/C.

_____________________________________________________________________________________

In This Section

Print Button, via Engineering Control P/N

See Also

Repair Order Detail Buttons

Cancel Button, via Repair Order Detail

Notes Button, via Repair Order Detail

Attachment Button, via Repair Order Detail

Control - E/C Button, via Repair Order Detail

Control Button, via Repair Order Detail

AWB Button, via Repair Order Detail

Tear Down Button, via Repair Order Detail

Requisition To Order Button, via Repair Order Detail

NLA Button, via Repair Order Detail

Send To Vendor Button, via Repair Order Detail

Audit Button, via Repair Order Detail

Release For Authorization Button, via Repair Order Detail

Effectivity Button, via Repair Order Detail

Interchangeable Button, via Repair Order Detail

Inventory Query Button, via Repair Order Detail

History Button, via Repair Order Detail

Repair Following Button, via Repair Order Detail

Create Picklist Button, via Repair Order Detail

Cancel Picklist Button, via Repair Order Detail

Top of Page Publication Date: 11/12/2024 Share Print