Publication Date: 11/12/2024
![]() ![]() ![]() ![]() |
||||||
MEL Master, Called On MEL TabThe MEL Master, Called On MEL tab allows the user create Called-On relationships between parent and child MELs. When a MEL is associated to a Defect Report, any called-on MEL schedules will also be associated to the Defect Report. The following drop down selection appears. Select an MEL for the A/C Type and Series. Once the Called On MEL is populated in the below field, select the Save The Called On MEL is now linked to the MEL. |
||||||
Top of Page |
Publication Date: 11/12/2024
![]() ![]() ![]() ![]() |
|||||