Publication Date: 11/12/2024
![]() ![]() ![]() ![]() |
|||||||
Select the Engineering Control
The following information/options are available in this window: Task Card The Task Card / Job Card that details the scheduled maintenance work. Link To Whether the Task Card is linked to a Task Card or E/C. E/C The Engineering Control that specifies aircraft or component scheduled maintenance intervals. Item (0 = ALL) The specific item number on the Task Card that this record is to be associated with. Leave default '0' to have this record associated with all item numbers on the Task Card. Identifier When a user saves, deletes or re-sequences, a history is added to the audit table and a new Identifier number is assigned to the Task Card for revision tracking purposes. Applicable Aircraft Enter an aircraft if it is the sole effective aircraft, leave blank for all. Sort Order Allows the user to specify the order that the E/C's Task Cards will be sorted in. These sequence numbers are sorted according to their numeric values. Group/Sub Group Grouping and Sub-Grouping allows for the automatic creation of Work Orders for Task Cards that share the same E/C. _____________________________________________________________________________________ Note: Refer to Switch If the Task Card is 'Pending Authorization', an error indicating that the E/C is not authorized will appear. To associate the E/C to a Task Card "Pending Authorization," it must be done through Engineering Authorization Management or Task Card Authorization Management while either are pending authorization depending on the configuration of Switch Additionally, relevant information can be entered through the Notes |
|||||||
Top of Page |
Publication Date: 11/12/2024
![]() ![]() ![]() ![]() |
||||||