PLANNING CONTROL > Due List, via Planning Control > Warning Messages (Planning Control)
Warning Messages (Planning Control)
Planning Control will provide alerts for the following scenarios. The alerts can either be soft warnings that are informational, or hard warnings that will prevent the attempted transaction from being saved.
- when an E/C is attached and there is already an E/C on a W/O for that specific aircraft (in order to prevent over-maintaining)
- when the W/O Status is not valid to add the E/C
- when the E/C or P/N Control does not contain any Task Cards
- when the E/C has been Terminated for a particular aircraft
- when the E/C has been Canceled for a particular aircraft
- when the E/C is Not Applicable to a particular aircraft
- when the E/C has been Rejected for a particular aircraft
- if an invalid E/C is selected
- if a P/N and S/N are not entered/found
- if the E/C is not effective to that aircraft
- if the E/C is not effective to the P/N and S/N
- if the E/C has not been authorized
- if the E/C is Terminated against the entire fleet and cannot be attached to any Work Order
- if the E/C is Canceled against the fleet and cannot be attached to any Work Order
- if the E/C is Not Applicable against the fleet and cannot be attached to any Work Order
- if the E/C is Rejected against the fleet and cannot be attached to any Work Order
- if switch
ECCBCDW is set to Yes, an alert appears when an E/C that has the Calendar Days field set to Yes is linked to a W/O - if the E/C already exists on a Work Order
- if the E/C has not been authorized
- if the P/N is not effective to the Work Order A/C
- if the P/N and S/N are not installed on the W/O A/C
- if the Task Card has not been authorized
- if the Task Card has a Location/Site conflict with the Location/Site of the Work Order
- if the E/C or P/N Control contains no mandatory Task Cards
- if a user selects a Parent E/C which controls the schedule of a Child E/C, the above warnings will appear for all dependent E/Cs.
|