Publication Date: 11/12/2024
![]() ![]() ![]() ![]() |
||||||
eMRO v5 - Planning SwitchesWhen set to Yes, the Show Due Date Planning switch allows hours and minutes to display in the Fleet Due List window. When set to no, the Show Due Date Planning switch will cause only the due date to display in the Due field. Note: The default setting for this switch is Yes and can not be changed since eMRO requires Live Planning functionality. When set to Yes, the system will run Planning Jobs simultaneously in batches using the value entered in the Config Number field to determine the size of the batch. If the value in the Config Number field is between 1-60, the system will run jobs in the indicated batch size. When the value in the Config Number field is greater than 60, the system will default to running jobs in batches of 60. Note: If the value in the Config Number is null (0), the system will run jobs in batches of 20 as the default setting. When set to No, the system will use the default Oracle Job scheduler to run and execute jobs. |
||||||
Top of Page |
Publication Date: 11/12/2024
![]() ![]() ![]() ![]() |
|||||