The following is a list of terms and abbreviations found throughout the eMRO system.
Name
|
Description
|
A/C
|
The Aircraft Registration
|
A/C Description
|
The Description of the Aircraft
|
A/C Flight Cycles
|
Enter the average number of flight cycles per day to forecast (overrides A/C Flight Schedule)
|
A/C Flight Hours
|
Enter the average number of flight hours per day to forecast (overrides A/C Flight Schedule)
|
A/C or P/N
|
The Aircraft or Part Number applicable
|
A/C Position
|
The Aircraft position reference
|
A/C Series
|
The Aircraft Series
|
A/C Type
|
The Aircraft Type
|
A/C Type/Series
|
The A/C Type/Series
|
Accepted
|
If the item has passed receiving inspection
|
Activate
|
Select to activate the employee schedule
|
Active
|
Select if this item is active
|
Actual
|
The actual time accumulated on the part
|
AD
|
Airworthiness Directive
|
Address
|
Contact Address
|
Alert Date
|
The Date the alert was calculated to have occurred
|
Alert Level
|
The reliability alert level for the Part
|
Allow Defer
|
If this card is allowed to be deferred
|
Amendment
|
The Current Amendment number of the E/C
|
AMM
|
Aircraft Maintenance Manual reference
|
Applicable
|
If this item is applicable
|
Approval No.
|
Company Vendor Approval number
|
Approved
|
The vendor approval references (CAA, FAA, etc.)
|
Approved Certificate
|
The item approved certificate reference (if applicable)
|
Area
|
The Area in which this Task Card is relative to
|
Assign to W/O
|
Displays the W/O Number if the item is already assigned to a Work Order
|
ATA
|
Air Transport Association reference
|
Attention
|
The person at the customer that this Order should come to the attention of
|
Authorization
|
The authorization status
|
Authorization Code
|
The Authorization code for the item
|
Authorization Step
|
Description of the step required
|
Authorized Amount
|
The Amount in Local currency that the user is authorized to.
|
Authorized By
|
The user that authorized this item
|
Authorized Date
|
The date that this item was authorized
|
Authority No.
|
The Aviation Authority Reference Number
|
Auto Issue
|
If Automatic Issue of the items is required upon receipt
|
Available Inventory
|
If available inventory for the part
|
Average Cost
|
The average cost for the Part in Local currency
|
AWB
|
The Air way bill number
|
Balance
|
The remaining Stock Balance after taking everything into consideration
|
Basic No.
|
The Basic Number of the Aircraft
|
Batch (Goods Received Batch)
|
Goods Received Batch When an item is first received into the system (via Order Receiving, RTS unknown, A/C load or Initial Load), it is allocated a 'Goods Received Batch' number which is taken from the 'Next Batch SEQ' in the system transaction configuration file.
At the same time, the system will put this number in the 'Batch' number field. So, when a part is first received, the GRB and Batch number will be the same.
This GRB number will stay with the item(s) for as long as they are in the company, until they are used (expendables), sold or scrapped.
Trax uses the GRB number to track the history for the item, it does not matter what happens to it (until sell or scrap), it will always be able to show the transactions. In the case of serialized items, the part number and/or serial number can be changed and it will still maintain the same history.
Batch The batch number is used as the current 'Tracking' number for an item(s).
When an item is first received, it gets the next batch number available (which is also used in the GRB). If the item is not serialized and has a quantity larger than one (1), when it is split into more than one part, each new part gets the next available batch number (for example, in the case of bin/location transfer). The GRB will stay with the new item (for traceability).
In the case of serialized items, when an item is sent away for repair and returned, it gets a new batch number (but again, it retains the GRB for traceability).
|
Bill To
|
The Third Party Customer Bill to Code
|
Bin
|
The Bin number where the item(s) will be stored
|
BOM
|
Bill of Materials reference
|
Bonded Warehouse
|
If this is a Bonded Warehouse Location
|
Both Way
|
Both Way Interchangeable
|
Box Number
|
Enter the box number of the item
|
Build Kit
|
Select if you require to build a kit with the picked items
|
Buyer
|
The person responsible for buying this part
|
Called on E/C
|
The E/C that will also call this E/C when it is added to a W/O
|
Cancel
|
If this item was canceled or ignored (as not applicable)
|
Cancellation
|
The Flight Cancellation code (if applicable)
|
Capital Expenditure
|
The Financial Capitalization Code
|
Category
|
The Category of the Item
|
Cell
|
The Cellular number for the Vendor
|
Cellular
|
Contact Cellular Telephone Number (GSM)
|
Certification Notices
|
Certification requirements for the item
|
Chapter (Ch)
|
The ATA Chapter
|
City/State
|
Contact City/State
|
Closed
|
If this item is completed or closed
|
Code
|
The Panel or Zone code
|
Company Name
|
The Name of the Company
|
Completed Number
|
The Number of times this E/C has already been completed
|
Completion Date
|
The Schedule complete date
|
Condition
|
The Condition code of the item
|
Config Date
|
Enter date configuration (if required)
|
Config Flag
|
Select function 'Yes' or 'No' (if required)
|
Config Number
|
Enter Configuration number (if required)
|
Config Other
|
Enter 'other' configuration text (if required)
|
Confirmation
|
The confirmation number for the Order
|
Conflict Task Card
|
The Conflict Task Card (current card not to be performed with this reference)
|
C/O
|
The Contract Order number.
|
Control
|
The Time Control to apply on this part
|
Control Category
|
The type of entry
|
Control Type
|
The Engineering Control Type
|
Corrosion
|
If this is a Corrosion Card
|
Counted Date
|
The date the bin was last counted (updated automatically from the physical inventory count)
|
Country
|
Contact Country
|
Created By
|
The User that Created this information
|
Created Date
|
The Date that this information was created
|
Credit Limit
|
The credit limit of the customer/vendor
|
Currency
|
The financial currency code
|
Custom Status
|
The item Custom Status (if applicable)
|
Customer
|
The recognized code for this customer (this could be an internal coding or the international vendor code)
|
Customer P.O.
|
The Customers Purchase Order reference
|
Cycles
|
The Aircraft Cycles
|
Cycles Installed
|
The number of cycles installed
|
Cycles Reset
|
The Aircraft or Part Number cycles at completion time
|
D/T
|
The Hourly Rate is charged at Double Time Rate.
|
Date Required
|
The date the part is required
|
Days
|
The number of days
|
Days Installed
|
The number of days installed
|
Days Reset
|
The Aircraft or Part Number days at completion time
|
Default Sort
|
The Sort Priority for this Task Card when printed in a W/O.
|
Defect
|
The Defect Log Number
|
Defect Category
|
The Defect Category Code
|
Defect Description
|
The Description of the defect
|
Defect Type
|
The Defect Type associated with this Part Transaction (if applicable)
|
Defect Type
|
The Defect Type (Pilot Report, Maintenance Report)
|
Defer
|
The Defer Code (if applicable)
|
Defer By
|
The person deferring the defect (if applicable)
|
Defer Category
|
The Defer Category (if applicable)
|
Defer Date
|
The Date of deferral (if applicable)
|
Defer Due Date
|
The End Date for the deferral (if applicable)
|
DEL Date
|
The required delivery date for the P/N
|
Delay
|
The Delay code (if applicable)
|
Delay Time
|
The Hours and Minutes of the delay (if applicable)
|
Department
|
The Department to carry out the step
|
Destination
|
Airport Code for Destination
|
Deviation Percent
|
The Allowable percentage deviation from the mean time before warning
|
Dimension of Box
|
The size of the box in the shipment
|
Discount
|
The code allocated for the customer discount structure
|
Discounts W/O
|
Percentage discount on the parts on a W/O
|
Dispatch
|
Select if the step will dispatch this revision to other locations
|
Document
|
The document reference for this compliance
|
Due Date
|
The calculated due date (or hard time date) of the item, shows in red if overdue
|
Duty Cost
|
The Customs Duty cost (if applicable)
|
E/C
|
The Engineering Control reference
|
E/C Cancel
|
The E/C that this E/C will cancel upon completion
|
E/C Description
|
The Short Description of the E/C
|
E/C Document
|
The E/C Document reference
|
E/C New
|
The E/C that this E/C will create effectivity for (start) upon completion
|
E/C Superseded By
|
The Engineering Control that supersedes the currently selected E/C
|
E/C Superseded Date
|
The date that the E/C was superseded
|
E/X
|
The Exchange Order number
|
Earliest
|
Select if the parameters are to be planned by the earliest occurrence. Deselect for the latest occurrence.
|
Effective Date
|
The Date that this item is effective from
|
Effectivity
|
The Effectivity of the Aircraft
|
Email
|
Contact Electronic Mail address
|
Employee
|
The Employee number or code representing the employee
|
Ending Date
|
The Date to finish the report
|
Essentiality Code
|
Manufacturers essentiality code
|
ERD (P/N Software)
|
Equipment Reference Designator
|
ETOP's
|
If this Part is has ETOP's effectivity applied
|
ETOP's Minutes
|
The number of minutes Extended Range Twin Operations that this Aircraft has
|
Evaluation No/Date
|
Company Vendor Evaluation number and date of evaluation
|
Exchange Cost
|
The Exchange cost from the Vendor
|
Expected Receive Date
|
The expected arrival date
|
Expenditure
|
The Expenditure code for the order
|
Expiration Date
|
Date of expiration of password
|
F.O.B.
|
Where the order items will Free On Board from
|
F/A
|
Fixed Assets
|
F/A Depreciation Month
|
Fixed Asset Depreciation Code for a particular component.
|
Factor 1 Cost
|
The cost per initial day of the rental
|
Factor 2 Cost
|
The cost in excess of the agreed number of days
|
Fault Confirm
|
If the defect was fault confirmed for reliability reporting
|
Fax
|
Contact Facsimile Number
|
First
|
The parameters for the first occurrence of the control
|
Flat
|
Flat Rated item
|
Fleet
|
Any Fleet types with Recurrent Items pending will display here.
|
Flight
|
The airline flight number
|
Flight Category
|
The airline flight category
|
Flight Date
|
The Flight date
|
Flight Leg
|
The Flight Leg number that you require to re-open
|
Flight Log
|
The Log Page number for the flight
|
Flights/Days
|
Select Flights or Days (for recurrent items)
|
FOB
|
Where the order items will Free On Board from
|
Format
|
The item format type
|
Freight Cost
|
The Freight cost (if applicable)
|
Freight Forwarder
|
If this vendor is a shipping company
|
From Task Card
|
The Task Card to copy from
|
From User
|
The user to copy the security information from
|
Fuel Burned
|
The fuel burned for this leg
|
G/L
|
The company general ledger account code, or department cost code (if applicable)
|
G/L Description
|
General Ledger Description
|
GRB or Goods Received Batch (Batch)
|
Goods Received Batch When an item is first received into the system (via Order Receiving, RTS unknown, A/C load or Initial Load), it is allocated a 'Goods Received Batch' number which is taken from the 'Next Batch SEQ' in the system transaction configuration file.
At the same time, the system will put this number in the 'Batch' number field. So, when a part is first received, the GRB and Batch number will be the same.
This GRB number will stay with the item(s) for as long as they are in the company, until they are used (expendables), sold or scrapped.
Trax uses the GRB number to track the history for the item, it does not matter what happens to it (until sell or scrap), it will always be able to show the transactions. In the case of serialized items, the part number and/or serial number can be changed and it will still maintain the same history.
Batch The batch number is used as the current 'Tracking' number for an item(s).
When an item is first received, it gets the next batch number available (which is also used in the GRB). If the item is not serialized and has a quantity larger than one (1), when it is split into more than one part, each new part gets the next available batch number (for example, in the case of bin/location transfer). The GRB will stay with the new item (for traceability).
In the case of serialized items, when an item is sent away for repair and returned, it gets a new batch number (but again, it retains the GRB for traceability).
|
Ground Time Require
|
The estimated Ground Time required to carry out this E/C
|
Handling Notes
|
Click here to enter notes for special handling instructions
|
Hazardous Material
|
If this Part is classified as a hazardous material
|
Hold
|
This item is on hold
|
Hourly Rate
|
How an employee is going to charge for a job
|
Hours
|
The item hours
|
Hours Installed
|
The number of hours installed
|
Hours Reset
|
The Aircraft or Part Number hours at completion time
|
Hrs/Min
|
The time at which this E/C was complied with
|
IFSD
|
The Engine in-flight Shut Down code
|
Impact Vendor Performance
|
Deselect to stop this return affecting this vendors performance rating
|
Inactive
|
This item is no longer used
|
Informational Tab
|
The Informational Tab displays the following information :-
|
Initial Fee
|
The fee for setting up the rental
|
Inspector
|
If this item requires an Inspector sign off
|
Insurance/Expiry Date
|
The Insurance company and Insurance Expiry date
|
Interchangeable Type
|
Type of interchangeability
|
Internal Capability
|
Select if this E/C can be accomplished by own organisation
|
Inventory
|
If this is a location for Inventory
|
IPC
|
Illustrated Part Catalogue reference
|
Issue To
|
If the EC has been issued to this fleet type (but the EC does not need to be put into effect)
|
Issue To
|
The person to whom the item is being issued
|
Issued By
|
The Authority issuing the Control (Aviation Authority or internal reference)
|
Item
|
The Item number
|
L/O
|
The Loan Order number
|
Label
|
Select for Identification labels (tags/form one)
|
Labor Tax
|
The Percentage Tax Rate for Labor
|
Labor
|
Any Labor hours recorded for the item
|
Lead Days
|
Lead time for an item
|
Leg
|
The Log Leg number for the flight
|
Level
|
The Level of corrosion noted from the inspection
|
Library
|
If this is a Library Location (for Technical Documents)
|
License
|
Employee License number
|
Line
|
The item Line number
|
Line No.
|
The Line Number of the Aircraft
|
LNG
|
The Landing time (HHMM)
|
Loans
|
Expand to view all the Loaned parts on the system (i.e., parts that are borrowed from vendors)
|
Location
|
The Location for the item(s)
|
Location Description
|
The description of this location
|
Lot Control
|
If this Part is Lot controlled from the manufacturer
|
M/O
|
The Manufacturer Order number
|
Main Contact
|
Name of the Main Contact
|
Main P/N
|
Main P/N reference
|
Maintenance Control
|
The Part Maintenance control code (i.e. Hard Time, On Condition)
|
Maintenance Facility
|
If this is a Maintenance Facility location
|
Man Hours
|
The Man hours required for this item
|
Man Require
|
The number of personnel required for this item
|
Mandatory
|
If this E/C is mandatory
|
Manual
|
The Item reference
|
Manual Category
|
The Category of item
|
Manual Description
|
A Description of the Manual/Document
|
Manual Reference
|
The Page Block or Reference from the manual
|
Manual S/N
|
The Item serial number
|
Manufacture/Date
|
Date and Name of Aircraft manufacturer
|
Material Tax
|
The Percentage Tax Rate for Material
|
Max T/O Weight
|
The Maximum Take-off weight of the aircraft
|
MDDR
|
The Deferred defect tracking number (if applicable)
|
Mean Cycles
|
The Mean Cycles that the aircraft will fly daily
|
Mean Hours
|
The Mean hours that the aircraft will fly daily
|
Mean Hours.Minutes
|
Mean time taken for total flight hours
|
Mechanic
|
If this item requires a Mechanic sign off
|
MEL
|
Minimum Equipment List
|
MEL CAT
|
The M.E.L Category (if applicable)
|
MEL No
|
The M.E.L Number (if applicable)
|
Menu
|
All menus available on the system will display here
|
Modified By
|
The User that last modified this information
|
Modified Date
|
The Date that this information was last modified
|
MPD
|
The Maintenance Planning Document reference for this Task Card
|
N.D.T
|
A List of all the Non-Destructive-Test Task Cards contained within the Work Order
|
NDT
|
If this is an Non-Destructive Test Card
|
Next E/C
|
The Next E/C to perform following zero number of repeats left
|
Next Site
|
(for Component Workshop movement) The Next Site where the component should be moved to
|
NHA P/N
|
The Next Higher Assembly Part Number
|
NHA S/N
|
The Next Higher Assembly Serial Number
|
NHK P/N
|
The next Higher Kit Part Number
|
NLA P/N
|
The Next Lower Assembly Part Number
|
NLK P/N
|
The next Lower Kit Part Number
|
No Of Boxes
|
The Number of boxes in the shipment
|
No. of Engines
|
The number of Engines on this Type/Series
|
Not Applicable
|
If this item is not applicable
|
Notes
|
Click to enter any notes relating to the corrosion
|
NT Workstation
|
The printer path for NT
|
Number
|
The hazardous reference number
|
Number of
|
The number of (Flights or Days) for recurrent items
|
Number of Defect
|
The Number of defects within the number of flights/days specified
|
O/T
|
The Hourly Rate is charged at Overtime Rate.
|
Off
|
The Off blocks time (HHMM)
|
On
|
The On blocks time (HHMM)
|
Operator/Date
|
The Operator of the Aircraft and Date operated from
|
Order
|
The print order of this item
|
Order
|
The Order number for the part (if applicable)
|
Order Line
|
The Line number from the Order
|
Order Maximum
|
The Maximum Order quantity allowed.
|
Order No
|
Order Number
|
Order Number
|
The order number
|
Origin
|
Airport Code for Origin
|
Originating Reference
|
The original reference that this revision came from
|
Other
|
The printer path for other operating systems
|
Other Tax
|
The Percentage Tax Rate for 'Other'
|
Over Night Station
|
The Station where the Aircraft will stop over night.
|
Override
|
Select if an aircraft tail number override is required
|
OVR
|
If the Item price was overridden
|
Owner
|
The Owner Code
|
Owner/Date
|
The Owner of the Aircraft and Date owned from
|
P/N
|
The Part Number
|
P/N Control
|
Part number control
|
P/N Description
|
The Description of the Part Number
|
P/N Interchangeable
|
Interchangeable Part Number
|
P/N Pre-Draw
|
The Material pre-load for the Work Order
|
P/N Superseded By
|
If applicable, the Part Number that has superseded this Part Number
|
P/O
|
The Purchase Order number
|
Pack Ship No
|
The system generated packing number
|
Packed By
|
The User that packed the shipment
|
Packed Date
|
The date the shipment was packed
|
Panel
|
The Panel reference to be removed for access
|
Paragraph
|
The ATA Chapter/Section/Paragraph (if applicable)
|
Password
|
The users individual password
|
Password Wall
|
The unique password for the employee selected
|
PBH
|
Power by the Hour
|
Pending
|
E/C is pending to be open
|
Phase
|
The Phase of the flight which the defect occurred
|
Phone
|
Contact Telephone Number
|
Picklist
|
The picklist reference number
|
Planner
|
The person responsible for material planning for this part.
|
Poisson Factor
|
The required service level required for the part (for re-order calculations)
|
Position
|
The Position reference
|
Post
|
Postal Reference (Zip/Post Code)
|
Prefer
|
Select if preferred vendor
|
Preferred Vendor
|
The preferred vendor to purchase the parts from (if applicable)
|
Pressure Cycles
|
If the cycles limitation is controlled by Brake Landings or Pressurized Cycles (not Cycles or Touch and Go's)
|
PREV A/C
|
The Aircraft's previous registration
|
Price
|
Price of part
|
Priority
|
The Priority of the requirement
|
Profile
|
The Code for the Company details
|
Protect Location
|
Protect the location field on the system for this user
|
QTY
|
The quantity of item(s)
|
QTY Installed
|
The Quantity of units installed in the position
|
Qty Required
|
The Quantity of items required
|
Quarantine
|
If this is a Quarantine location (sub-warehouse)
|
Quote No. Line
|
The system allocated quote number and line
|
R/I
|
Receiving Inspection
|
R/I Control
|
Receiving Inspection Control
|
R/I Flag
|
If this Part requires secondary receiving (inspection)
|
R/I Notes
|
Click here to enter notes for the receiving inspection routine
|
R/N
|
The Rental Order number
|
R/O
|
The Repair Order number
|
RCV QTY
|
The receive quantity (non-serialized items)
|
Reason
|
The Reason this Aircraft has an override
|
Reason Category
|
The reason for changing the part
|
Receive P/N
|
The Part that you will receive from the Customer
|
Received P/N
|
The Part number received from the Customer
|
Recurrent
|
The recurrent type (either DEFECT or PART)
|
Recurrent Category
|
The recurrent category (as defined in the System Transaction Codes)
|
Recurrent Description
|
A brief description of the recurrent item (will default to the ATA description)
|
Regular
|
The Hourly Rate is charged at Regular Rate.
|
Regular Lead Time
|
Percentage discount on Sales parts on normal lead time
|
Rejected
|
If the item has not passed receiving inspection
|
Related Quarantine Location
|
The main location linked to this Quarantine location
|
Reliability
|
Is this a Reliability Control Defect
|
Remaining
|
The Remaining time on the item (Hours, Cycles, Days)
|
Remarks
|
Any general remarks about the compliance
|
Rental
|
Expand to view all the Rental parts on the system (i.e., parts that are rented to customers)
|
Re-open Order
|
Click here to re-open the original Order for the quantity returned
|
Reorder
|
The suggested reorder level
|
Reorder Level
|
The Reorder point for the Part.
|
Repair
|
If this vendor is a repair agency
|
Repair Code
|
The required repair action to be taken on the part you will receive
|
Repair Cost
|
The estimated cost of the repair (if applicable)
|
Repeat
|
The parameters for the repeat occurrence of the Control (if applicable)
|
Repeat Number
|
The number of times to repeat this E/C
|
Reported By
|
The Person reporting the defect
|
Reported Date
|
The Date other defect was reported
|
Require By
|
The Date that the items are required by
|
Require Date
|
The Date that the items are required by
|
Requirement
|
The Detail of the pre-load requirement
|
Requires R.I
|
This will display if the Part requires secondary receiving inspection prior to being available in inventory
|
Requisition
|
The system allocated Requisition number
|
Requisition Description
|
The description of the requirement
|
Requisition Number/Line
|
The system allocated Requisition number and Line number
|
Requisition Type
|
The type of requisition (re-order, purchase)
|
Reserve
|
Reserve the spare when W/O reservation is applied
|
Reserve
|
Select to reserve this item for your control only (until released)
|
Reset
|
If the Engineering Control accumulated time should be reset upon completion of the Work Order
|
Reset By
|
The User Id that reset the completion
|
Reset Date
|
The Date from which the control should be reset (if applicable)
|
Residual Value Percent
|
The Residual value after the number of F/A Depreciation months expressed as a percentage
|
Resolution Category
|
The Resolution category
|
Resolution description
|
The description of the resolution
|
Resolved By
|
The Person resolving the defect
|
Resolved Date
|
The date of resolution
|
Revised
|
If this item has been revised (will highlight background on print)
|
Revised by
|
The user that revised the item
|
Revised Date
|
The date that the item was revised
|
Revision
|
The revision number
|
Revision Control
|
Internal revision number
|
Revision Description
|
The Description of the item revision
|
Revision Update
|
Select if the step will be a revision update
|
RTN W/I Days
|
The number of days the unit is to be returned within
|
S.S.I.D
|
A List of all the Supplemental Structural Inspection Detail Task Cards contained within the Work Order
|
S/N
|
The Serial Number
|
S/O
|
The Sales Order number (i.e., the Customer Order)
|
S/V
|
The Service Order number
|
SB
|
Service Bulletin
|
Schedule
|
The Schedule for the item (Hours, Cycles, Days)
|
Schedule
|
The Schedule code (shift) the employee works
|
Schedule Cycles
|
The cycles life limitation on this E/C (if applicable)
|
Schedule Date
|
The Schedule date limit on this E/C (if applicable)
|
Schedule Days
|
The days life limitation on this E/C (if applicable)
|
Schedule Hours
|
The hours life limitation on this E/C (if applicable)
|
Schedule Revision Days
|
The scheduled number of days between revision
|
Schedule Start Date
|
The Schedule start date
|
Secondary Currency Average Cost
|
The average cost for the Part in your Secondary currency
|
Section (Sec)
|
The ATA Chapter and Section
|
Sell Labor Amount
|
The Flat rate and surcharge amount (if applicable)
|
Sell Labor Method
|
The method to cost the labor selling price
|
Sell Material Amount
|
The Flat rate and surcharge amount (if applicable)
|
Sell Material Method
|
The method to cost the material selling price
|
Sell Other Amount
|
The Surcharge amount (if applicable)
|
Sell Other Method
|
The method to cost 'other' selling prices (additional billing items)
|
Send P/N
|
The Part that you are sending to the Customer
|
Service Date
|
The Date the Aircraft originally went into service
|
Shelf Life EXP
|
The item(s) shelf life expiry date (if applicable)
|
Shelf Life Expiration
|
The item Shelf Life Expiration date (if applicable)
|
Shelf Life Flag
|
If this Part is shelf life controlled
|
Ship from
|
The location goods are being shipped from
|
Ship To
|
The Receiving Customer/Vendor/Location
|
Ship Via
|
The Ship Via vendor for this transaction (if applicable)
|
Shipped By
|
The User that shipped the items
|
Shipped Date
|
The date that the items were shipped
|
Shipping Notes
|
Click here to enter notes for special shipping instructions
|
Short Lead Time
|
Percentage discount on Sales parts on lead time less than standard
|
Sita
|
The SITA address of the vendor
|
Site
|
The Site for the item
|
Skill
|
The code to represent the skill for work in the system
|
SLID (P/N Software)
|
Software Location ID
|
Sort Order
|
The Sort Order (Printing Sequence) of the Task Card.
|
Spare
|
If the item is a spare required (not a tool or other)
|
SSID
|
If this is a Supplemental Structural Inspection Detail Card
|
Standard Cost
|
The standard cost for the Part in Local currency
|
Start A/C Block Hours
|
The starting total block hours for this Aircraft
|
Start A/C Brake Cycles
|
The starting total fully braked cycles for this Aircraft (not including Crew Training)
|
Start A/C Cycles
|
The starting total cycles for this Aircraft (including Touch and Go's, Crew Training)
|
Start A/C Flight Hours
|
The starting total flight Hours for this Aircraft
|
Station
|
Station Code
|
Status
|
The Current status of the item
|
Status Category
|
The sub-status of the card (hold/defer reason)
|
Step Order
|
The step number order
|
Stock Maximum
|
The Maximum in stock quantity allowed.
|
Stock UOM
|
The ATA code for Unit Of Measurement (or internal code if preferred)
|
Sub Detail Title
|
The Sub detail title
|
Sub Location
|
The Sub Location where this item is stored
|
Sub-Category
|
The Sub-Category of the Part as defined in the Part Sub-Category table (e.g. Engine, Module, Disk, Landing Gear etc.)
|
Supplier
|
If this vendor is a supplier
|
Surcharge
|
Material is calculated at the Standard price from the P/N Master plus the Sell Material Amount
|
Surcharge
|
Labor is calculated at the Standard price from the Skill Master plus the Sell Labor Amount
|
Swap
|
If this was a swap (Rob or interchange)
|
System Code
|
The configuration code
|
System Code Description
|
The description of the configuration code
|
T/O (flights)
|
The Take Off time (HHMM)
|
T/O (orders)
|
The Transfer Order number
|
Task Card
|
The Task Card reference
|
Task Card Description
|
The Task Card Description
|
Tax Cost
|
The Tax cost (if applicable)
|
TEL
|
The Telephone number of the vendor
|
Terms
|
The normal terms of the Vendor/Customer
|
Text
|
The text for this item
|
Third Party
|
If Work Order is for a Third Party Customer
|
Time
|
The Time of the transaction (on the aircraft)
|
To Task Card
|
The task Card to copy to
|
To User
|
The user to copy the security information to
|
Tool Calibration Flag
|
If this Part has a tool calibration life
|
Tool Life EXP
|
The item(s) tool life expiry date (if applicable)
|
Tool Life Expiration
|
The item Tool Life Expiration date (if applicable)
|
Total Cost
|
The Total cost of the Order
|
Total Cost
|
The Total Cost to you for the item
|
Total Sell
|
The Total Sell price to the customer for the item
|
Transaction
|
The Transaction option for the part(s)
|
Transaction Type
|
The type of transaction record
|
Type of Transaction
|
The type of component change
|
Type/Series
|
The Aircraft Type/Series
|
U/S Code
|
The Unserviceable code for the part (if applicable, only visible when Quarantine Location selected)
|
Unit Control
|
The number of units to record (one measurement, two measurements etc.)
|
Unit Cost
|
The Unit Cost of the item
|
Unit Sell
|
The Unit Sell price of the item
|
Unit Type
|
The type of unit to record (fuel, oil etc.)
|
Unscheduled
|
If this was an unscheduled component change
|
UOM
|
The unit of measurement
|
User
|
The user code
|
User Id
|
The User Id carrying out the labor
|
V.A.T
|
Vendors Value Added Tax reference
|
Value
|
Enter the required value for customs (to be printed on the pro-forma invoice)
|
Variable Engineering No.
|
The Variable Engineering Number of the Aircraft
|
VAT
|
The VAT reference for the Company
|
Vendor
|
The Vendor code or number
|
Vendor Lot
|
The Vendor Lot number (manufacturers batch), if applicable
|
Void
|
If the flight log No. was void (i.e. used for maintenance and not for a flight)
|
W/C
|
The Warranty Claim number
|
W/O
|
The Work Order number
|
W/O Control Sheet
|
The Work Order Tally sheet (sign-off)
|
Wall
|
Select if this option requires wall security
|
Warranty Cycles
|
Number of Cycles warranty on the part
|
Warranty Days
|
Number of Days warranty on the part
|
Warranty Hours
|
Number of Hours warranty on the part
|
Weight
|
The weight of the shipment
|
Weight and Balance
|
If this Task Card affects weight and balance on the aircraft
|
Window
|
The window program used for this button
|
Work Date
|
The Date of the company vacation day
|
X/O
|
The Exchange Order Out number
|
Zone
|
The Zone area for the Task Card
|