Publication Date: 11/12/2024
![]() ![]() ![]() ![]() |
|||||||
The Engineering Request Review
Select the Engineering Request Review
The following information/options are available in this window: A/C The individual aircraft tail number. W/O The work order number that the Task Card with the discrepancy is on. E/C The Engineering Control that specifies aircraft or component scheduled maintenance intervals. P/N The Part Number reference for the aircraft part. This is the affected part number. S/N The Serial Number for the specific serialized part. This is the serial number affected. Task Card The Task Card / Job Card that details the scheduled maintenance work. This is the Task Card that the Engineering Request was reported on. Module The system module that the discrepancy was created in: Technical Records (via Defect Report), Production (via Production W/O Task Card), GSE (via GSE W/O Task Card), Shop (via Shop W/O Task Card). Location The location where the Engineering Request was created. Description The description of the Task Card. This field will be auto-populated once a Task Card is selected from the Task Card drop-down field. Status The status of the Engineering Request discrepancy (Open, Under Review, Reviewed, Rejected, Closed). Assigned to The person that the discrepancy is assigned to. Date Assigned The date when the discrepancy was assigned to the user. Category The discrepancy category as entered by the reporting user. Due Date The date/time the Engineering Request needs to be actioned by. Close Date The date when the discrepancy is closed. This field is only available when the discrepancy is in 'Reviewed' Status. Reason The reason as to why the discrepancy is being reported. _____________________________________________________________________________________
For additional functionality, refer to the following buttons:
|
|||||||
Top of Page |
Publication Date: 11/12/2024
![]() ![]() ![]() ![]() |
||||||