Publication Date: 11/12/2024
![]() ![]() ![]() ![]() |
||||||
GSE Engineering Compliance, Revision History TabThe Engineering Control, Revision History tab displays the history of revisions for the currently selected Engineering Control.
The following information/options are available in this window: E/C The Engineering Control that specifies aircraft or component scheduled maintenance intervals. Revision The revision number of the E/C. This can be alpha numeric. When the revision is changed and saved, the system will prompt the user with a revision control record, where the changes made for the specific revision can be saved for auditing purposes. The 'Revised By' field will be automatically updated with the user's user code, and the revision date can be set as required. Revised Date The date the E/C was put into revision (if E/C is currently in revision), or the date the final authorization step was completed in the E/C revision authorization process. Authorization Date The date the record was authorized. Authorization Action The action taken against the authorization of the E/C Revision, including Accepted, Rejected, etc. Description The description of the reason for the revision. This can be edited at a later time, but not after it has been authorized. _____________________________________________________________________________________ |
||||||
Top of Page |
Publication Date: 11/12/2024
![]() ![]() ![]() ![]() |
|||||