Publication Date: 11/12/2024 Share Print

Previous Topic

Next Topic

Book Contents

Book Index

GSE Engineering Compliance, General Tab

Users can manually create a compliance record for the GSE E/C as opposed to automatic compliance via the GSE module (GSE Work Orders) via the GSE Engineering Compliance option.

eMRO-GSE Engineering Compliance, General tab

 

The following information/options are available in this window:
_____________________________________________________________________________________

Control Type

The Engineering Control Type (E/C or Task Card).

Status

The status of the E/C. When creating a new E/C the initial status will default to Pending; if the user requires to hold this E/C until ready it can be left as Pending, or alternatively it can be changed to another status.

The following Status options are available:

Applicable/Not Embody - The E/C is applicable to an A/C Type/Series or Part Number, but may not be mandatory. This status allows the E/C to be entered in the system, but does not require compliance.

Cancel - The E/C has been cancelled.

N/A - The originating document (AD, SB, MOD, etc.) has been evaluated and is deemed not effective to a specific A/C or P/N.

Open - The E/C is Open.

Pending - This is the default status. This will be the status until the E/C is authorized. If the user requires holding this E/C until ready, it can be left as Pending even after the record has been saved. Once the E/C is authorized the status will show as Open.

Rejected - The E/C was rejected or not authorized and may need to be sent back through the authorization process for revision. This status should not be selected manually.

Terminated - The E/C is no longer in use. It has either been complied with for all effective aircraft or components, or the action of another E/C has terminated it. When an E/C is terminated, the termination applies to the entire fleet. This status should not be selected manually.

E/C

The Engineering Control that specifies aircraft or component scheduled maintenance intervals.

Company

The name of the airline company for which the E/C will be utilized.

Sub E/C

The Sub E/C used to auto generate the E/C reference. This is a free text field used for naming purposes only.

Category

The category of the E/C (e.g., AD, SB, CHECK).

Sub Category

A Sub Category can be used to further define the E/C Category, if applicable. For example, users may want to classify their ADs for Engines, APUs, and Landing Gear separately. The Sub Category System Transaction Code is set up via Settings/ Explorer/ System Transaction Code/ Engineering.

Classification

The classification of the E/C (i.e. Mandatory, Optional, etc.).

E/C Description

The description is the basic title of the E/C. The number of characters is limited in this field and a longer description can be entered in the E/Cs E/C Content Tab.

Revision

The revision number of the E/C. This can be alpha numeric. When the revision is changed and saved, the system will prompt the user with a revision control record, where the changes made for the specific revision can be saved for auditing purposes. The 'Revised By' field will be automatically updated with the user's user code, and the revision date can be set as required.

Note: If Switch ECAUTH is set to Yes, authorization will be required for all E/Cs that have been revised.

Revision By

The user who creates and/or authorizes the E/C revision.

Date (Revision Date)

The date the E/C was put into revision (if E/C is currently in revision), or the date the final authorization step was completed in the E/C revision authorization process.

Amendment

The amendment field normally relates to AD amendment numbers. This is alpha numeric and issued by the authority or company issuing the P/N E/C.

Issued By

The vendor or authority (i.e. FAA, JAA Task Card.) who issued the E/C.

Issued Date

The date the E/C was issued by the vendor or authority.

_____________________________________________________________________________________

See Also

GSE Engineering Compliance

GSE Engineering Compliance, Schedule Tab

GSE Engineering Compliance, Other Tab

GSE Engineering Compliance, E/C Content Tab

GSE Engineering Compliance, Optional Tab

GSE Engineering Compliance, Informational Tab

GSE Engineering Compliance, Revision History Tab

GSE Engineering Compliance Buttons

Top of Page Publication Date: 11/12/2024 Share Print