Publication Date: 11/12/2024 Share Print

Previous Topic

Next Topic

Book Contents

Book Index

Planning Control 7.1

Planning Control

 

Planning Results, via Due List Window

7.1

Note: Planning elements are sorted from oldest to newest by their respective Due At (date and time).

7.1

Note: If an E/C has a Limit Schedule against it, a Limit Schedule limit schedule indicator icon will appear next to the record.

 

Interactive Planner Window

7.1

Time Frame drop downs - Use the drop down to filter the records based on an inputted Time Frame. Use the first drop down to establish an applicable integer and the second drop down to select a viable time value (i.e Days, Weeks, Months, and Years). Lastly, select the apply button to implement the time frame.

Topic updated: 1/11/2024 7:22:36 AM

See Also

eMRO 7.1

Engineering 7.1

GSE 7.1

Inventory 7.1

Link 7.1

Orders 7.1

Planning 7.1

Production 7.1

Receiving 7.1

Requisition 7.1

Settings 7.1

Shop 7.1

System Standards 7.1

Technical Records 7.1

TraxDoc 7.1

Top of Page Publication Date: 11/12/2024 Share Print