Publication Date: 11/12/2024 Share Print

Previous Topic

Next Topic

Book Contents

Book Index

Transfer E/C Button, via Shop W/O Engineering Control

The Transfer E/C button is used to transfer Engineering Controls to another Shop Work Order. E/Cs may need to be transfered from one Shop W/O to another due to scheduling conflicts or other issues that may affect the completion of the required tasks.

From the Shop W/O Engineering Control window, select one or more E/Cs to be transferred by selecting the Transfer checkbox. Then click the Transfer E/C button.

The following drop down menu appears. Select a different Work Order that this E/C will be transfered to. Only those Work Orders that the specific E/C can be transferred to will appear in the drop down selection window.

eMRO_TransferECButton(1)

A informational window pops up informing which E/Cs will be transfered.

Select Yes to proceed with the transfer.

The selected E/Cs are then removed from this W/O.

Notice that the selected E/Cs have been transferred to the selected Work Order.

See Also

E/C Button, via Shop W/O Non-Routine Task Card

Shop W/O Engineering Control, Informational Tab

Notes Button, via Shop W/O Engineering Control

Task Card Button, via Shop W/O Engineering Control

Attachment Button, via Shop W/O Engineering Control

Effect of Shop W/O T/C Status Update on Shop W/O E/C

Top of Page Publication Date: 11/12/2024 Share Print